ML19209C147

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Deviation Noted in IE Insp on 790807.Corrective Actions:New Stack Monitoring Sys Installed at Hot Cell
ML19209C147
Person / Time
Site: Battelle Memorial Institute, 07000008, 05000060
Issue date: 09/17/1979
From: Toy H
Battelle Memorial Institute, COLUMBUS LABORATORIES
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19209C145 List:
References
NUDOCS 7910120046
Download: ML19209C147 (1)


Text

.

OBattelle Columbus Laboratorse*

505 Aing Avenue Columbus, Ohio 41201 Telephone 1614, 424 h4.'4 Teles 24 5454 September 12, 1979 Mr. A. B. Davis, Chief Fuel Facility and Materials Safety Branch U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Davis:

This is in response to your letter of August 29, 1979, regarding the inspection of our licensed activities conducted by your Messrs. C. C. Peck and D. E. Miller on August 7-10, 1979.

Please be advised that the deviation identified in the report has been co rrec ted.

The new stack monitoring system at the Hot Cell has been installed and is in operation.

Installation and operatf;n of the system was completed on August 15, 1979.

We trust this action is satisfactory and resolves the deviation.

Very truly yours, Harley L. Toy NRC Licensing Coordinator HLT:lba 1143 082 OYb 7 91012,0 4O DEP 17197'.