ML19209C147
| ML19209C147 | |
| Person / Time | |
|---|---|
| Site: | Battelle Memorial Institute, 07000008, 05000060 |
| Issue date: | 09/17/1979 |
| From: | Toy H Battelle Memorial Institute, COLUMBUS LABORATORIES |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19209C145 | List: |
| References | |
| NUDOCS 7910120046 | |
| Download: ML19209C147 (1) | |
Text
.
OBattelle Columbus Laboratorse*
505 Aing Avenue Columbus, Ohio 41201 Telephone 1614, 424 h4.'4 Teles 24 5454 September 12, 1979 Mr. A. B. Davis, Chief Fuel Facility and Materials Safety Branch U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Davis:
This is in response to your letter of August 29, 1979, regarding the inspection of our licensed activities conducted by your Messrs. C. C. Peck and D. E. Miller on August 7-10, 1979.
Please be advised that the deviation identified in the report has been co rrec ted.
The new stack monitoring system at the Hot Cell has been installed and is in operation.
Installation and operatf;n of the system was completed on August 15, 1979.
We trust this action is satisfactory and resolves the deviation.
Very truly yours, Harley L. Toy NRC Licensing Coordinator HLT:lba 1143 082 OYb 7 91012,0 4O DEP 17197'.
50 Years Of Senice 1929-1979