ML19209C023

From kanterella
Jump to navigation Jump to search
Forwards Amend 66 Revising Tech Specs to Reflect Min Fire Brigade Shift Size Per NRC 790828 Request
ML19209C023
Person / Time
Site: Rancho Seco
Issue date: 10/02/1979
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19209C024 List:
References
NUDOCS 7910110410
Download: ML19209C023 (1)


Text

t a

o p F..'; }i;y "]

1 LEh 4 s a.

St,CRAf/EliTO f 0)faiCSAL U12 TTY CI'iTRl:'T Ej C201 S Street, 604 155320, Sacramento, California 95813; (91E) 452-3?ll October 2, 1979 Director of Nuclear l'cactor P.e.,ulat icn Attention:

Darrell G.

Eisenhut. Acting Director Division of 0

  • rating Reictors U. S. Nuclear Regulatory Cormiis : ion Washington, D. C. 20555 Docket No. 50-312 Proposed Ar'endmen t No. 66 Minimum Fire Brigade Techn! cal Specification Rancho Seco Nuc1(ar Cenerating Station, Unit No. 1

Dear Mr. Eisenhut:

~

Your letter of August 28, 1979, requested that our Technical Specifi-cations oe revised to include the requirements of the "SRC Evalua t ion of Mininium Fire Brigade Shift Size."

We intend to nahe this Technical Specification effective within 90 days of the issuance of the amendraent.

This subnittal u. exenpt from the requested Class III fee under the pro-vision of Footnote 2 to 10 CFR 170.22.

Feotnote 2 does permit the exemption of certain types of li se amendmnts from fees.

These are:

1.-

Thc

.a fee Clar u s I, 11 and III which result fron written Commission reque. provided that they have cal-j ninor safety significance, are to simplif y or clarify the license or Technical Specifications cnd are being issued for the convenience of the Commission, and, 2.

Orders issued by the Commission pursuant to 10 CFR 2.204.

The Conv.issicn required this revision via a letter from you (NRC) dated August 28, 1979.

If you have any questions concerning this proposal, please contact Mr. Ron Colenbe of az Ranebo Seco staff.

Sincerely yours, O r. /JLh4 J.<I.Mattinoe

&u it Assistant Ceneral Manne r and Chief Engineer Subscribed and morn to before rM.'

. 4.I "/,, '.,

l j.J V7J OOC this 2nd day of October, 1974 v

f}

ib / -

l 7.

a

^ ~ 'y

.a NLU 1

i 2L. lih ! '

., ;5

  • cett'v".uti)c, M i l e\\si,0 a es i f., rn ty.,f u

v 92 01.L O Lf f h t'

Ccor

/N

' e t a r-3 the county a san amento, Q ' ' 1.,

  • ' 3/

r My Cu aissien E.s p i r e > January i /N9.t ft!<

P :. r i,:

i

":n v e A t.

y_,tec

. ;ar n i, s i of c,. t i t

,,