ML19209B880

From kanterella
Jump to navigation Jump to search
Notification of 790911 & 12 Meetings W/Exxon to Discuss Jet Pump BWR Info Requirements.Revised Agenda Attached
ML19209B880
Person / Time
Issue date: 08/30/1979
From: Hannon J
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7910110093
Download: ML19209B880 (3)


Text

8 UNITED STATES

[..

NUCLEAR REGULATORY COMMISS!ON f

k

{,O.I.lh '.h WASHINGTON, D. C. 20555 l I 2

... '.. j August 30, 1979

'g MEMORANDUM FOR:

T. A. Ippolito, Chief, ORB #3, D0R FROM:

J. N. Hannon, Project Manager, ORB #3, 00R

SUBJECT:

FORTHCOMING MEETING WITH EXXON TO DISCUSS JET-PUMP BWR INFORMATION REQUIREMENTS Time and Date:

9:00 A.M. - September 11, 1979 9:00 A.M. - Septt ber 12,1979 Location:

P-ll4 - September 11, 1979 P-ll4 - Septemb^r 12, 1979

Purpose:

To discuss jet-rurrp BWR infomation requirements

Participants:

NRC iC Kneil, D. Fieno, L. Phillips, T. Novak, Z. Rosztoczy, P. Check, B. Morris, F. Coffman, T. Speis Exxon G. Owsley, et al.

gig w

ww John N. Hannon, Project Manager Operating Reactors Branch #3 Division of Operating Reactors

Attachment:

Revised Agenda

!s!

1 i sjh l_',l-a v

~

i ji 0 267 7 91011f c/

AGENDA FOR JP-BWR MEETINGS Tues., 9/11 ECCS ANALYSIS 9:00 AM 1.

Description of Models (Blowdown, Reload / Refill, Heat-up) 2.

Verification of obdels (Including FCTF Programs) 3.

' Sample Calculations THERMA!.-IlYDRAULIC TOPICS 1.

Design Methodology 2.

Plant Transients, Methodology and Application 3.

Analysis and Application of Uncertainties Determination of MCPR Limits 4.

9/11, 1:00 PM NEUTRONICS TOPICS S Wed., 9/12 9:00 AM 1.

Design Methodology a)

Models b)

Verification 1)

Power Distribution 2)

Reactivity Coefficients 3)

Rod Norths 4) 3-D Transient Behavior 2.

Reactivity Accident and Transients: Rod Drop, Rod Withdrawal, Misloading Error a)

Analysis Methodology b)

Sample Calculations c)

Method Verification d)

Generic Applications 3.

Neutronic Related Uncertainties a)

Power Distribution b)

Reactivity Coefficients c)

Kinet:.c Behavior 4

Instability Analysis a)

Methodology and Sample Calculation b)

Verification c)

Generic Analysis 1O 268

~

AGE DA FOR JP-BWR MEETINGS Page 2 Wed., 9/12 MANACEMENT SUIBIARY 1:00 PM 1.

Licensing Schedule P,equirements 2.

Topical Reports and Peload Applications a)

Overview of Contents b)

Submittal Schedule c)

Review Schedule 3.

NRC Response i'

0 2o9

MEETING mJ:CE DISTRIBUTION Docket Files NRC PDR Local PDR ORB #3 Rdg NRR Rdg HDenton ECs.se Diisenhut WGamill BGrimes -

RVollmer LShac JMiller TIppolito RReid VNoonan GKnighton DZiemann ASchwencer DDavis PCheck Glainas RClark FPagano NHaller OELD OI&E (3)

OSD (3)

CThayer Receptionist ACRS (16)

NRC Participants SSheopard

.roject Manager N

[

l' 0 270 i

i