ML19209B880
| ML19209B880 | |
| Person / Time | |
|---|---|
| Issue date: | 08/30/1979 |
| From: | Hannon J Office of Nuclear Reactor Regulation |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910110093 | |
| Download: ML19209B880 (3) | |
Text
8 UNITED STATES
[..
NUCLEAR REGULATORY COMMISS!ON f
k
{,O.I.lh '.h WASHINGTON, D. C. 20555 l I 2
... '.. j August 30, 1979
'g MEMORANDUM FOR:
T. A. Ippolito, Chief, ORB #3, D0R FROM:
J. N. Hannon, Project Manager, ORB #3, 00R
SUBJECT:
FORTHCOMING MEETING WITH EXXON TO DISCUSS JET-PUMP BWR INFORMATION REQUIREMENTS Time and Date:
9:00 A.M. - September 11, 1979 9:00 A.M. - Septt ber 12,1979 Location:
P-ll4 - September 11, 1979 P-ll4 - Septemb^r 12, 1979
Purpose:
To discuss jet-rurrp BWR infomation requirements
Participants:
NRC iC Kneil, D. Fieno, L. Phillips, T. Novak, Z. Rosztoczy, P. Check, B. Morris, F. Coffman, T. Speis Exxon G. Owsley, et al.
gig w
ww John N. Hannon, Project Manager Operating Reactors Branch #3 Division of Operating Reactors
Attachment:
Revised Agenda
!s!
- 1 i sjh l_',l-a v
~
i ji 0 267 7 91011f c/
AGENDA FOR JP-BWR MEETINGS Tues., 9/11 ECCS ANALYSIS 9:00 AM 1.
Description of Models (Blowdown, Reload / Refill, Heat-up) 2.
Verification of obdels (Including FCTF Programs) 3.
' Sample Calculations THERMA!.-IlYDRAULIC TOPICS 1.
Design Methodology 2.
Plant Transients, Methodology and Application 3.
Analysis and Application of Uncertainties Determination of MCPR Limits 4.
9/11, 1:00 PM NEUTRONICS TOPICS S Wed., 9/12 9:00 AM 1.
Design Methodology a)
Models b)
Verification 1)
Power Distribution 2)
Reactivity Coefficients 3)
Rod Norths 4) 3-D Transient Behavior 2.
Reactivity Accident and Transients: Rod Drop, Rod Withdrawal, Misloading Error a)
Analysis Methodology b)
Sample Calculations c)
Method Verification d)
Generic Applications 3.
Neutronic Related Uncertainties a)
Power Distribution b)
Reactivity Coefficients c)
Kinet:.c Behavior 4
Instability Analysis a)
Methodology and Sample Calculation b)
Verification c)
Generic Analysis 1O 268
~
AGE DA FOR JP-BWR MEETINGS Page 2 Wed., 9/12 MANACEMENT SUIBIARY 1:00 PM 1.
Licensing Schedule P,equirements 2.
Topical Reports and Peload Applications a)
Overview of Contents b)
Submittal Schedule c)
Review Schedule 3.
NRC Response i'
0 2o9
MEETING mJ:CE DISTRIBUTION Docket Files NRC PDR Local PDR ORB #3 Rdg NRR Rdg HDenton ECs.se Diisenhut WGamill BGrimes -
RVollmer LShac JMiller TIppolito RReid VNoonan GKnighton DZiemann ASchwencer DDavis PCheck Glainas RClark FPagano NHaller OELD OI&E (3)
OSD (3)
CThayer Receptionist ACRS (16)
NRC Participants SSheopard
.roject Manager N
[
l' 0 270 i
i