ML19209B563
| ML19209B563 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/02/1979 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910100142 | |
| Download: ML19209B563 (1) | |
Text
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (21518414000 October 2, 1979 Mr. Themas A. Ippolito, Chief Operating Reactors Branch 3 Division of Operating Reactors U.S. Nuclear Regulatory Cer:: mission Washington, DC 20555 SU3 JECT: Additional Informatien on Peach Bottcm 3 - Reload 3 License Amendment Application, Docket No. 50-278
Dear Mr. Ippolito:
In recent telecons between cembers of your staff and our peruennel, Mr. Verrelli requested that we clarify the results given in Appendix A of General Electric Document ED0-2h20hA which was filed in sup; irt of the subject Applicatien. The following is provided in accordance with that request.
The leading error limiting LEGR value (18.h Kw/Ft) given in Appendix A for the misplaced P8DR326hH event corresponds to the UO2 fuel rods. The LEGR's corresponding to the 174 plastic strain limits, provided on page 2-8 of General Electric Document NEDE-2h011-P-A, desenstrate that margin exists to the strain limits for UO2 f"Ol*
Based on infor=ation provided by General Electric Ccepany, we have determined that the LEGR of both UO2 and UO2 - Gd 0 rods 2
for the Peach Bottem 3 - Reload 3 mislocated PSDEB2chH bund e remain below their respective 1?f plastic strain limits throughcut the entire exposure rarge.
Very truly yours,
/
. / /_' m u y M.
. Cocney/
Su[erintendent Generation Division / Nuclear 1 1If
'q0 1 1 J ',t J5
(
60
\\
7 910100 I R