RO 2-79-43/1P:on 790906,in Response to IE Bulletin 79-07, Failure in One Support Associated W/High Pressure Svc Water Sys Piping in RHR Room 2A Identified.Larger Anchor Bolts Will Replace 7/8 Inch Bolts W/Installation of Plate Washers
ML19209B432
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/07/1979
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
NUDOCS 7910090708
Download: ML19209B432 (2)


Text

, y.

u._ . - - - - . , . .rc 7 7 7

-s . Jr PHILADELFNIA ELECTRIC COMPANY Fesch Bottom Atomic Fewer Station Delta. Femasylvania }p U j 5eptember 7 197- .

Nr. Soyce N. Crier i Office of Taspection and Enforcement l Region 1 l Omited States Naciese Regulatory Commission  ;

631 Park Avenue {

King of Prussim, FA 19406 50RJECT: RE70RTABLE OCCURRENCE - FROMPT NOTIFICATIGN _

Confirming J. E. Davenport's conversation with Mr. Greenman.

Region E. United States-Nuclear Regulatory Cennission en ,_

September 7, 1979.

Reference:

Dechet No. 50-277 4 Fesch setten Unit 2 j Teckmical Specification

Reference:

6.9.2.n(9) l Report me. 2-79-43/IP occurrence Date: September 6 1979 .

2 Identification of Occurrence: }

i The centimwing seismic macher inspection program being performed j in response to 1.E. au11etin 79-02 kas identified a failure in 3 ene support associat6d with the high pressure service water system plylag in the 2A AMR room. . ,

Ayyarent Cause: 5 Emproper instastation of ancher botts. ,

Analysis of Occurrence: i pering the inspection of hanger number 32-GR-541 two belts failed due to shell projecties from the estl of greater than I/R inch.

4 Failure of this support anchor.may not have remmited in fafIure of the. supported piping system during a seismic event since alt four bolts in the sucher still meet the torque requirements.

Nomever, even if this pip 5mg system wantd have failed, only two  !

containment.cet ting subsystems wonto be affected and both LFCI subsystems would still remain operable.

Co rre ct ive A c.t i o n :-

%h M Fresently, the original 7/8" she11 type anchors are being re-ydaced mith 1 1/4"~hilti kwin bolts. Also. 4" s 4" piste mashers are being installed en the plate to assure the proper lJl7 gpg 7 910 0 00 7CP f

  • C
  • y y ,, 1

_ y.'

piste edge to anchor bolt hole distance.

Previous Failures 2-79-33/1F 2-79-35/1F- }

3-79-19/1F J 3-79-23/1F 3-79-25/1F 3-79-26/1F Yery truly yours.

W. 7. W11 rich. Supwrintendent Fesch 9etten Atomic Fower Station WFJ/JED:1ja