ML19209B157
| ML19209B157 | |
| Person / Time | |
|---|---|
| Site: | Allens Creek File:Houston Lighting and Power Company icon.png |
| Issue date: | 09/11/1979 |
| From: | Sohinki S NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | DOHERTY, J.F. |
| References | |
| NUDOCS 7910090256 | |
| Download: ML19209B157 (3) | |
Text
NRC PUBL1L pgCUMENT R.00M 4
UNITED STATES OF A!! ERICA fiUCLEAR REGULATORY C0!! MISSION BEFORE THE ATOMIC SAFETY MlD LICENSit:G E0ARD In the Matter of
)
)
N 3
j// g
[?, p HOUSTON LIGHTIflG & POWER C0ftPAflY
)
Docket fio. 50-466
)
,f f
/.
p" (Allens Creek fluclear Generating
)
f3 [',/
J L.
Station, Unit 1)
)
IT g
Mh t'.'
/$
T' Ngf;.
(
flRC STAFF'S PESPONSE TO JOHN F. DOHERTY'S THIRD N E e --
'~
REQUEST FOR DOCUMENTS FROM THE flUCLEAR REGULATORY C0f t :ISSION
%CM The NRC Staff responds as follows i.o John F. Doherty's third request for production of documents, dated July 24, 1979:
1.
1.E. Bulletin fio. 78-09, "BWR Drywell Leakage Paths"...,
6/14/79.
Enclosed.
2.
NRC's Letter of Acceptance dated 4/17/74 to General Electric, of G. E. Document fled 0 10,527.
(Referred to in Section 15.3(2) of Supp. #2 to the SER).
Enclosed.
3.
Letter from G. G. Sherwood, Manager Safety & Licensing, General Electric to D. G. Eisentat, NRC, 3/29/77, Letter flo. 114-77050.
The Staff has no record of this document in its files.
Please check your citation to make sure that it is correct.}) 25b 06 2 2910090 t. i G
. 4. NEDO 21,156 (Applicant does not have) Flow Induced Vibi-ation and Correction in BWR fuel assemblies" (undated) This is a GE proprietary document, arrangements for reviewing of which would have to be made with GE directly. 5. NEDO 20,606A " Creep collapse analyris of BWR fuel using SAFE-COLApS model (undated). (Applican does not have.) Enclosed. 6. Staff Letter to General Electric (R. Heinemann to I. Stuart) of 4/7/76, identifying infonnation required on the GESSAR-238 N.S.S.S. docket by 6/30/76. See response to No. 3. 7. Research Information Letter #6, Office of NRr. (sorry, I don't have date). s Request withdrawn by Intervenor in letter to Staff counsel. 8. Letter from S. Varga (NRC) to G. Sherwood (G.E.) transmitting comment on the GE Company exceptions to Reg. 01ide i.54. (2/1/77). Enclosed. 9. G.E. Company Letter (G. Shcrwood to S. Varga) responding to Staff comments on G.E. Co., exceptions to Reg. Guide 1.54 (2/8/77). Enclosed. 3r-1,l ). I U
. 10. ACRS letter (D. Moeller to M. Rowden) reporting Conriittee Revica of GESSAR-238 ilSSS, and GESSAR-251 Applicaticn (12/17/76). Enclosed. 11. Gen. Electric letter (W. Gilbert to S. Varga responding to ACRS letter of 12/17/76. Enclosed. Respectfully subnitted, y Stephen M. Schini:i Counsel for f4RC 5taff Dated at Bethesda, Maryland, this lith day of September, 1979. 1113 057}}