ML19209A946
| ML19209A946 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 05/24/1979 |
| From: | Eaton M Sierra Club |
| To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML19209A945 | List: |
| References | |
| NUDOCS 7910050656 | |
| Download: ML19209A946 (1) | |
Text
n i u u t.c.
u n ne va, eco~3 g
4-0a890cE144002 05/24/79 ICS IPMRNCZ CSP SACB 1 9164483112 MGM TORN SACRAMENTO CA 05-24 0316P EST N
C6 SIERRA CLUB MRE
.)
gt shg lg g
$[
1107 9 ST ROOM 1020 Oggig;~
{
4N O
SACRMAMENTO CA 95814 ep$5h II i \\ (p m
THIS MAILGRAN IS A CONFIRMATION COPY OF THE FOLLOWING HESSAGE:
9164483112 MGM TDRN SACRAMENTO CA 113 05-24 0316P EST ZIP ATTN MR SAMUEL J. CHILK SEC.RETARY COMMISSION NUCLEAR REGULATORY COMMISSION WASHINGTON OC 20555
REFERENCE:
DOCKET NUMBER 50-312 ON BEHALFrJFTHEMEMBERSHIPOFTHbSIERRA CLUB IN SACRAMENTO COUNTY AND THROUGHOUT CALIFORNIA, I URGE YOU TO SCHEDULE A PUBLIC HEARING OF THE FULL COMMISSION ON THE SAFETY OF THE RANCHO SECO NUCLEAR POWER PLANT AT THC EARLIEST OPPORTUNITY. THE HEARINGS SHOULD BE HELD IN SACRAMENTO AND SHOULD PROVIDE FOR A FULL AIRING OF l'ME VIEWS OF NRC STAFF, SMUD, AND INTERESTED CITIZENS ON THE QUESTIONS tF THE SAFETY OF THE PLANT AND POTENTIAL GENERIC DEFECTS OF B&W REACTORS, SUCH A HE.*' TING IS ESSENTIAL IF SMUD AND THE NRC ARE TO RETAIN THE CONFIDENCE OF THE CITIZENS OF CALIFORNIA, MICHAEr R. EATON l
ENERGY ISSUES COORDINATOR SIERRA CLUB LEGISLATIVE OFFICE 1107 9 ST ROOM 1020 SACRAMENTO CALIFORNIA 95814 15:17 EST
} lob MGMCOMP MGM 7910050 G