[h BALTI M O RE GAS AN D E LECTRIC CO M PANY GAS AN D ELECTRIC BUILDING B ALTl M O R E, M A RYLAN D 212 03 Antsun E. LUN DVALL,JR.
"[,"[,
- September 4, 1979 Mr. Boyce H. Grier, Director Region I, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19h06 Subjec;: Calvert C~iffs Nuclear Power Plant Units Nos.1 & 2, Docket Nos. 50-317 & 50-318 IE Bulletin No. 79-14 Seismic Analyses for As-Built Pipinst Systems
Dear Mr. Grier:
This letter constitutes the 60 day report required by IE Bulletin 79-14.
We have completed the inspection required by item 2 of the Bulletin for all accessible systems (both redundant and non-redundant) of both Unit 1 and 2.
Results of the inspection on each individual piping " stress problem" were categorized as follows:
Group 1 - No non-conformance, or minor non-conformance(s) that clearly do not affect system operability.
Group 2 - Non-conformance elements are judged to be significant, but a review of the original calculation indicates that the impact on the system operability or functionality is minor. Exa=ples of this group are non-conformance of pipe support locations, pipe segment length, etc.,
on a lov stressed piping system. Group 2 systems can be operated, but analyses must be updated and/or minor mo#.ifications completed.
Group 3 - Non-conformances are judged to be possibly significant and the review of the original calculation indicates that there may be i= pacts to the operability or function-ality of the system. Examples are missing seismic supports at a highly stressed location, etc.
d q910050
?1106 006
Mr. B. H. Grier Page 2 September h, 1979 Group k - Discrepancies previously identified, resulting from a re-definition of the boundtries between seismic and non-seismic systems. The re-definition added additional conservatism to the original as-built design criteria as described in the FSAR, and several additional pipe supports were designed, but not yet installed su=marizes results to date; attachmeat 2 itemizes non-confornances found, action planned, and estims+ad schedule for completing action. Our schedule for the remainder of the inspection program is as explained in our letter of July 31, 1979 Very truly'vours,
)
I d'
/
Qw paw,
WOY W
z
~
cc:
J. A. Biddison, Esquire G. F. Trowbridge, Esquire Mr. E. L. Conner, Jr. - NRC Mr. J. W. Brothers - Bechtel Office of Inspection & Enforcement U. S. Nuclear Reguhtory Cc. mission Division of Reactor Inspection Washington, D. C.
20555
,"i 106 037
ATTACHMENT 1 IE BULLETIN 79-14 INSPECTION RESULTS THROUGH 8/31/79 Unit 1 Unit 2 Total Problems Complete 80 87 Partial Problems (Accessible Area) Complete 28 27 Inaccessible Problems 94 63 Results Group 1 70 86 Group 2 5
1 Group 3 0
0 Group h 5
0 1106 003 Description Of Non-Conformances c
Action Estimated Non-Conforman e Required Comple'tio Problem Isometric Unit Group No.
No.
System 1
2 9
SKM 608 Sh 11 Shutdown Heat Exchanger Minor deviation in Update 9/28/79 geometry (dimensions).
Analysis C7s SKM 608 Sh 12 Piping CZ3 Minor deviation in CED SmM 608 Sh 18 support location.
1 2
kl SKM 620 Sh 1 Component Cooling Piping Valves heavier than Update hff9/28/79 analy Analysis SKM 620 Sh 2 1
2 81A SEM 621 Sh 2 Condensate From Storage Supports not in agree-Update
_.9/28/79 ment with analysis.
Analysis Tank Valve added to system, Update 9/28/79 1
2 169 SKM 783 Component Cooling Water not incorporated in Analysis SKM 786 analysis.
SKM 822 1
2 207 SKM 827 Salt Water to ECCS Pump Support missing.
Install 9/15/79 Support SKM 816 Hoom Cooler No. 12 2
2 2-41 SMM 945 Sh 1 Component Cooling Piping Valve Weights.
Update 9/28/79 Analysis SKM 945 Sh 2 1
h 382-SKM 1095 Diesel Staruing Air Supports missing.
Install 9/15/79 Supports 1
h 381 SKM 1094 Diesel Starting Air Supports missing.
Install 9/15/79 Supports 1
h 379 SNM 1088 Diesel Starting Air Supports missing.
Install 9/15/79 Supports 1
h 380 SKM 1089 Diesel Starting Air Supports missing.
Install 9/15/79 Supports 1
h 378 SKM 1086 Demineralized Water to Supports missing.
Install 9/15/79 Service Water Head Tanks-Supports Make Up e