ML19209A196

From kanterella
Jump to navigation Jump to search
Forwards CEN-115P Re Response to IE Bulletin 79-06C.Also Forwards WCAP-9584-P Re Analysis of Delayed Reactor Coolant Pump During LOCA & B&W Analysis.Repts Withheld (Ref 10CFR2.790)
ML19209A196
Person / Time
Site: Davis Besse 
Issue date: 09/06/1979
From: Heltemes C
Office of Nuclear Reactor Regulation
To: Kaufman N
EG&G, INC.
References
NUDOCS 7910030100
Download: ML19209A196 (2)


Text

'

gg4

~ POOR BRIGWL 61m SEP Mr. N. Kaufman LOFT Project EG&G P. O. Box 1625 Idaho Falls, Idaho 83401

SUBJECT:

Transmittal of Reports:

l t

(1)

" Response to NRC IE Bulletin 79-06C Items 2 and 3 l

for Combustion Engineering Nuclear Steam Supply Systems," CEN-ll5P (Proprietary)

(2)

" Analysis of Delayed Reactor Coolant Pump Trip Druing Small Loss-of-Coolant Accidents for Westinghouse Nuclear Steam Supply Systems," WCAP-9534 (Proprietary) f (3)

" Analysis Sumary in Support of an Early Reactor Coolant Pump Trip " Babcock and Wilcox Company (Docket No. 50-346,8/29/79)

Dear Mr. Kaufman:

In accordance with the recent request of Dr. G. D. McPhersen of our Office of Research, we are enclosing the subject reoorts on tripping l

the reactor coolant pumps following a postulated loss-of-coolant accident.

l These reports may be used to assist you in the audit calculation being performed by EG&G in support of the Nuclear Regulatory Cornission.

.Since the Westinghouse and Combustion Engineering reports contain " Proprietary Infomation" they should be withheld from public disclosure pursuant to 10 CFR Section 2.790(b). Thus, the contents of these doctments should not be discussed with unauthorized persons and should be stored in a manner that' the contents do not become available to unauthorized persons.

Towards this end, you should treat these documents in accordance with the Memorandum of Understanding between the NRC and DOE dated February-24, l

1978, and NRC Manual Chapter 1102, " Procedure for Placecent of Work with DOE," Exhibit 4, Item 4.

Both of these cited documents have been previously transmitted to Dr. Ybarrondo of EG&G.

1085 128 7 910 0 3 0 / ced

_2 I

(EP 6 1973 Following completion of your review, you should return the proprietary reports and related proprietary calculation to NRC Central Files, 7920 Norfolk Avenue, Bethesda, Maryland 20014.

Sincerely, e-gir.31.irned bY:

c. :. Yem:n :=

C. J. Heltemes, Jr., Chief Project Management Group Bulletins & Orders Task Force Enclcsures:

As stated Distribution:

J. Lee I. Villaiva G. McPherson C. Heltemes SB Rdg & Chron File NRC PDR Central Files 1085 129