ML19209A029

From kanterella
Jump to navigation Jump to search
Notifies That Final Rept to Deficiency 77/13 Re Safety Relief Valve Control Sys Will Not Be Available Until 790301
ML19209A029
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/03/1978
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7910010806
Download: ML19209A029 (1)


Text

.

f MISSISSIPPI POWER & LIGHT COMPANY l

If elping B uild Alis sis sippi JtM @ ai:e P. O. BOX 1G40 J ACK SON, MISSISSIPPI 3020S

^"E"*

e oouctio~otra rutur U. S. Nuclear Regulatory Commission f,

[

Of fice of Inspec tion and Enforcement

.i Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J.

P.

O' Reilly, Director

Dear Mr. O' Reilly:

S U B.J ECT: Grand Gulf Nuclear Station File 0260/0498/15525/15526 Interim Report No. 3 For PRD No. 77/13 Safety Relief Valve Control System AECM-78/55 On February 1, 1978, we filed an interim report on a deficiency in the Safety Relicf Valve Control System for Grand Gulf Nuclear Station.

We had anticipated that a final report would be available by August 1, 1978.

Iloweve r, the General Electric Company and the NRC have encountered delays in reaching agreement on a generic solution, and we now estimate that our final report will be available March 1,1979.

Yours truly,

.../ - -

g('..u

,i c -

jh J. P. McGaughy, Jr.

Director of Power Production J RF/LFD:db cc:

Mr. T.

B. Conner, Jr.

Mr.

R. C. Travis q

y.- ~

r0 T. i.bj 6 Dr. Ernst Volgenau, Director (. THis COPY FOR v-Division of Inspection & Enforcement

.E

(~,7 h,',,."d # -

G.'

e U.S.

Nucicar Regulatory Commission Washington, D. C.

20555 782230013 f A 791001070 %

o Member Middle South Utilities System

)

,,']