ML19209A029
| ML19209A029 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/03/1978 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7910010806 | |
| Download: ML19209A029 (1) | |
Text
.
f MISSISSIPPI POWER & LIGHT COMPANY l
If elping B uild Alis sis sippi JtM @ ai:e P. O. BOX 1G40 J ACK SON, MISSISSIPPI 3020S
^"E"*
e oouctio~otra rutur U. S. Nuclear Regulatory Commission f,
[
Of fice of Inspec tion and Enforcement
.i Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J.
P.
O' Reilly, Director
Dear Mr. O' Reilly:
S U B.J ECT: Grand Gulf Nuclear Station File 0260/0498/15525/15526 Interim Report No. 3 For PRD No. 77/13 Safety Relief Valve Control System AECM-78/55 On February 1, 1978, we filed an interim report on a deficiency in the Safety Relicf Valve Control System for Grand Gulf Nuclear Station.
We had anticipated that a final report would be available by August 1, 1978.
Iloweve r, the General Electric Company and the NRC have encountered delays in reaching agreement on a generic solution, and we now estimate that our final report will be available March 1,1979.
Yours truly,
.../ - -
g('..u
,i c -
jh J. P. McGaughy, Jr.
Director of Power Production J RF/LFD:db cc:
Mr. T.
B. Conner, Jr.
Mr.
R. C. Travis q
y.- ~
r0 T. i.bj 6 Dr. Ernst Volgenau, Director (. THis COPY FOR v-Division of Inspection & Enforcement
.E
(~,7 h,',,."d # -
G.'
e U.S.
Nucicar Regulatory Commission Washington, D. C.
20555 782230013 f A 791001070 %
o Member Middle South Utilities System
)
,,']