ML19208D883

From kanterella
Jump to navigation Jump to search
Forwards Final Rept of Deficiency 77/15 Re Inability of Turbine Bldg to Withstand Tornado Wind Loads
ML19208D883
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/28/1978
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19207A121 List:
References
AECM-78-66, NUDOCS 7910010622
Download: ML19208D883 (1)


Text

P l(

MISSISSIPPI POWER & LIGHT COMPANY l

.h i

f 1;

Helping Build Mississippi b

I BOX 164 0. J ACKSO N. MIS SIS SIP PI 3 92 05 P. O.

L PRODUCTeON D ( P A R I ed E N T August 28, 1978 U. S. Nuclear Regulatory Coc=ission E'

Office of Inspection and Enforcement c'

Region II 101 Furietta Street, Suite 13?)

?

Atlanta, Georgia 30303 Attention: Mr. J. P. O' Re illy, Di rec tor

Dear Sir:

SUBJECT:

Grand Gulf Nuclear Stction Units 1 and 2 Docket No. 50-416 and 50-417 File 0260/0498/15525/15526 PRD 77/15 Final Report as Defined in 10CFR50.55(e)

AECM-78/66 Company contacted Mr. V. L. Brownlee of your Mississippi Power 6 Light the office on December 14, 1977 of a potentially reportable deficiency at This deficiency concerned Grand Gulf Nuclear Station construction site.

d the design of the turbine building to withstand design basis tornado vin we filed an interie report which stated this loads. On January 16, 1978, a final matter was reportable within the meaning of 10CFR50.55(e) and that 28, 1978. Details of our findings including report voald be filed by Augustcorrective coc=iteents are described in the attached matter.

Yours truly, J. P. McGaughy, Jr.

Director of Power Production JRr/LFD:ls Attachment i\\

cc:

Mr. N. L. Staepley Mr. R. B. McGehee g

o 4-94-1-04447m Mr. T. B. Conner

~~7 A et s ^ c n o, n l

Dr. Ernst Volgenau, Director l

l Division of Inspection & Enforcement U. S. Nuclear Regulatory Coccission Washington, D. C.

20555 1032 a 91oo1o gyg 3

.