ML19208D726

From kanterella
Jump to navigation Jump to search
Submits Info Re Progress of Ceb Load Analysis Per IE Bulletin 79-02.Remaining Results to Be Provided by 790901. Delay Caused by Manpower Limitations Due to IE Bulletin 79-14 Efforts
ML19208D726
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/15/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
1-089-6, 1-89-6, NUDOCS 7909290424
Download: ML19208D726 (1)


Text

' '

'. CENTRAL FILES n PDR:HQ

. [ j R b NSIC ARKANSAS POWER & LIGHT COMPANN POST OFRCE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-4000 August 15, 1979 l-029-6

' ^ %-9 Mr. K. V. Seyfrit. Director Office of Inscectien & Enforcement U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, SuiL 1000 Arling+an, Texas 76011

Subject:

Arkansas Nuclear One-linits T & 2-Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 IE Bulletin 79-02 (File: 1510.1, 2-1510.1)

Gentlemen:

The following is' provided in order to keep you informed as to our progress in satisfying the requirements of IE Bulletin 79-02.

We have completed our CEB load analysis assuming flexible base plates for AN0-1. A total of 37 supports having safety factors of less than 2 were identified. These have been corrected to within the bulletin specificar. ions. A total of 82 supports have been identified with safety factors greater than 2 but less than the safety factors requi ed by IE Bulletin 79-02. These will be processed as indicated in our vuly 6, 1979 letter.

The support analysis for ANO-2 is not complete at this time due to the manpower limitations resulting from our IE Bulletin 79-14 effort. We will provide you with results from this analysis September 1,1979.

All supports with safety factors of less than 2 identified to date have been ccrrected.

Very truly yours, E M b kh David C. Trimble Manager, Licensing DCT:M0W:nak

' Or ,  !

fl 1054 C12

-eemmu sours uriuries systm

  • f G)

~

~ ' . Mr. K. V. Seyfrit, Director August 15, 1979 cc: Mr. Norman C. Moseley Director, Division of Reactor Operations inspection Nuclear Regulatory Comission 4350 East West High.vay Bethesda, Maryland 20555 Mr. Bill Johnson U.S. nuclear Regulatory Comission Port Office Box 2090 Russellville, Arkansas 72801

[