ML19208D639

From kanterella
Jump to navigation Jump to search
Notification of 790927 Meeting W/Util & State of Ma to Review Emergency Plan Against Current Criteria & Reg Guide 1.101.Agenda Encl
ML19208D639
Person / Time
Site: Pilgrim
Issue date: 09/14/1979
From: Hannon J
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7909290151
Download: ML19208D639 (3)


Text

s s

r'

/

MEETING NOTICE DISTRIBUTION Docket Files

- ->NRC PDR Local PDR ORBf3 Rdg NRR Rdg HDenton ECase DEisenhut WGammill BGrimes -

RVollmer LShao JMiller TIppolito RReid VNoenan GXnighton DZienann ASchwencer DDavis PCheck Glainas RClark FPagano NHaller i

OELD OI&E (3)

OSD(3)

CThayer Recepticnist ACRS (16)

NRC Participants SSheppard Project Manager 790920 0 / F/

1055 166

9 s

.c 9 p t p#

[9

  1. 'o, UNITED STATES s

!I NUCLEAR REGULATORY COMMISSION g,,, k3 7.,.. g WASHINGTON, D. C. 20555

...../

SEPTEMBER 1 4 1979 g

Docket No. 50-293 MEMORANDUf1 FOR:

T. A. Ippolito, Chief, Operating Reactors Branch #3, 00R FROM:

J. 11. Hannon, Project Manager, Operating Reactors Branch #3, 00R

SUBJECT:

FORTHCOMING MEETING WITH BOSTON EDISON COMPANY AND THE STATE 0F MASSACHOSETTS Time and Date:

8:30 a.m. September 25 to COB September 27, 1979 Location; Plymouth, Massachusetts

Purpose:

To review Pilgrim Unit No.1 Emergency Plan against current criteria and Regulatory Guide 1.101.

Participants:

Utility:

H. Bal four, et. al.

NRC:

J. Sears, et. al.

Special Instructions:

The technical meetings on September 26 and 27,1979 will be held in the Blue Room in Memorial Hall to allow the public to observe the proceedings.

h John N. Hannon, Project Manager Operating Reactors Branch #3 Division of Operating Reactors

Enclosure:

Agenda 1055 167

e AGENDA PILGRIM 1 EMERGENCY PLAN SITE VISIT TUESDAY, SEPTEMBER 25, 1979 8:30 a.m. - 12:00 p.m.

Hold fact finding and data collection meeting with licensee staff at Pilgrim 1 site Points of Interest 1.

Overview of site concepts of emergency operatiens 2.

Onsite or local features which may present special problems 3.

Tour of site emergency facilities 4.

Review of sample of emergency procedures 1:00 p.m. - COB Conduct tour of local area Points of Inte'e_st 1.

Local agencies which implement protective actions a.

Towns b.

Parks, etc.

2.

Road network (potential impediments) 3.

Local features that present special problems 4.

Population distribution h'EDNESDAY, SEPTEMBER 26, 1979 9.00 a.m. - COB Hold meeting with licensee to discuss NRC requirements and results of preliminary plan review.

This will be a technical business meeting between the NRC staff and licensee.

\\ 1 r

1055 168

4

?,

' THURSDAY, SEPTEMBER 27, 1979 9:00 a.m. - COB Hold discussion with State and Local Authorities responsible for coordination and implementation of protective action.

This will be a technical business meeting between the NRC staff and the State and Local authorities.

Point, of Interest 1.

Overview cf State and Local concepts of emergency operations 2.

Local features which may present special problems 3.

NRC site licensee requirements f

1055 169