ML19208D251

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1151/79-11.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Records & Mgt of Matls Control Sys.Details Withheld (Ref 10CFR2.790)
ML19208D251
Person / Time
Site: Westinghouse
Issue date: 09/04/1979
From: Gillespie F, Hodges J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19208D241 List:
References
70-1151-79-11, NUDOCS 7909280160
Download: ML19208D251 (1)


Text

MATTPJAL TM'T"TT' ""."TH CONI ldHS 2.73 i.Z.'.:. ".i103

/ g n,%*,

UNITED STATES 8

o't NUCLEAR REGULATORY COMMISSION f

REGf 0N il g

a s o

'8 101 MARIETTA ST., N.W., SUITE 310o 8

ATLANTA, GEORGIA 303o3 o

~...

S E P -41979 Report No. 79-11 Docket No. 70-1151 License No. SNM-1107 Safeguards Group III Licensee: Westinghouse Electric Corporation "uclear Fuel Division Columbia, South Carolina 29205 Facility: Westinghouse Electric Corporation Inspection at:

Columbia, South Carolina Inspection Conducted: August 21-24, 1979 Date of Last Material Control and Accounting Inspection Visit: May 31, 1979 Type of Ihspect'on: Unannounced Material Control & Accounting Inspector: -

g.}/h, & U

/),,,!*.;'

f

/

J. W. Hodg s,-$a eguards Auditor

_ Date

/

Approve'd by:

'/4 // [ //N l/H/

/

F. P. Gillespie, Chfef, MC&A Section ate Safeguards Branch Inspection Summary:

Areas Inspected:

Facility Organization, Facility Operation, Records and Reports, and Management of Materials Control System.

The inspection involved 24 inspector-hours on site by one NRC inspector and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in four areas examined during the inspection.

s-r2 79 75 f Copy

_cf Copies T-~cs This2n-

$ n not to be reprcGuced It9 :t Epecifio approval c :_":!I lg-.tT7""Tn""!!:TH 7909280lfO.o $1 CONTIJ::S 2.70 001.""

10%

.,/