Text
O e
a W
- r zu
.~m e
r' s
Y 3 CORSum8f5
'l Power i.
- / Company a.a.,.i ome..
- :n2 w..
wen..a 4.no s.c..on. u.en.g.a.on.
4,.. coa. s'7 7es-o s so
'$ O U
~
Aurast 1, 1979
- & Ja:es G Keppler Office of Inspection and Enforce ent Regie III US Nuclear Regulatory Cc =issic:
799 Roosevelt Road G' aa n ' yn,
cCl37 OCC:CI 50-255, LICI'!SE OFR : ~ -.: w :,a....,...,.---. u.
.: ua.. is Ite= 1 of II Eulletin 79-14 (Seismic Analyses for As-3ui' Safety-Reisted Piping Systems) requires response by August 1, 1979 C0:sumers ?over Cecpany's respcase is attached. Along with cur response is a set of drawings which vill be distributed as follows:
1 Set to Region III 1 Set to Office of Inspectie: and Z:'orce=ent, 'a'ashington, ;C This is in accordance with telephone instructions frc= Mr 3cyd of Regien !!*
on July 27, 1979 Iavid ? Eoff=an (Sie, ed)
David ? Ecffman Assistant nuclear Licensing Ad=inistrater CC Direetcr, Office of Huclear Reactor Regulatic Director, Office of Inspectics and Enforce =ent 1052 055 gq C
7n093801
'4.
ul
Attachnent 1 Ite= 1 of II Bulletin 79-lh IdentiP/ inspection elements to be used in veriffing that the seismic analysis input infor=ation confor=s to the actual configuration of safetJ-related systems.
For each safety-related syste=, sub=1t a list of design docu=ents, including title, identification nu=ber, revision and date, which were sources of input information for the seis=ic analyses. Also, sub=it s. description of the seis=ic a=alysis input infor=ation which is contained in esca dc.cu=ent.
Identify systems or portions of systems which are planned to be inspectd during each sequential inspection identified in Ite=s 2 and 3 Suh=it all of this infor=ation within 30 days of the date of this bulletin.
Response
I.
I'! SPEC *IC:7 ElEE"!"'S Faragraph 1 o' " '" etin 79-1k requests " identification of inspection ele =ents to te used in verifying tha: the sei.ic analysis input infor=atien confer =s to e e actual configura:icn of safet,-related systems."
A two-stage progra: is scheduled. The first stage is inspection of nor ally accessible nenredundant systems and one set of redundant s', stems. If no significant deviations are found, this vill be reported and the second stage (inspection of the re=ainder) =ay not be cc=pleted.
The inspection elements are identified as follows:
A.
FOR ?IPI:iG SYSTIMS OVER 2 ::iCHIS 1.
Survey the actual installs e17_ng gec=etry, supports (location, function and clearance), valves and valve operators, including trpe, location ncd weight to verify that these ite=s confor= to design doci:=enta. Piping geccetry vill be ec= pared with fabricater isc=etries while supports, alves and crerators vill be ec= pared with fabricator drawings.
A variety of inspection =ethods vill be used, such as =easuring tape (or s'-'ar nessuring equip =ent) for piping gec=etry, visual ec=parison of piping supports with the support drawing, etc.
In-sulation vill not be re=cved to facilitate inspection.
2.
Cc= pare the inputs to seis=ic analysis with ce=posite drt. wings and with fabricator drawings.
3.
FCR ?!?!:IG SYSTIG 2 I:ICHIS A'ID L*:TIIR 1.
These piping syste=s vere installed to criteria designating sup-por location; ie, the char =ethod as opposed to ec=puter analysis.
~
1052 056
2 The chart =ethod is conservative; therefore, 2-inch and under pipir; is excluded frc= this response and evaluation.
II.
DESIGH DOCtH EITS Paragraph 1 of II Sulletin 79-1!+ requests that a list of design docu=ents, including title, identification number, revision and date, which vere sources of input infor=ation for the seismic anal / sis for each safety-related system, be provided. Also requested is a description of the seis=ic design analysis input infor=ation which is contained in each document. The following is provided:
A.
PIPING GECMETRY Cc=puter seis=ic analysis was perfor=ed utili:ing the ec=posite area drawings listed in Appendix A.
3.
SIIS:1IC RESPONSI SPICTRA Appropriate ficor response spectra were developed and utill:ei in analysis of safety-related piping syste=s. These spec ra are being provided to the URC staff as part of the systenatic evaluation progra:
and, therefore, are not included.
C.
PIPING AND FITTING SCEIDLT.,ZS Data on piping and fitting schedules are listed in Document 5935-M-259, Revision 9 (12-20-78), " Piping Class S - -7."
Insulation infor:ation is also included in this docu=ent.
D.
PRESSURIS AND TEMPERATURES Data on pressure and te=peratures is listed in Docu=ent 5935-M-260, Revision T (10-20-78), " Piping Class Sheets."
I.
SU??CRT, VALVI. tid VA1VE OPERATCR DATA
'4 eights, type and other infor=ation related to pipe supports, valves and valve operators was taken fro various Vendor and Cvner drawings.
For exa=ple, valve outline drawings received frc= valve nanufacturers contain the valve weight, operator weight and di=ensions of operators.
Support dravings show the rigidity and load capability of pipe supports.
This infor=ation is on file.
III.
IDE'ITIFICATION OF SYSTEMS Applicable piping in the safety systems identified by tha N11sades FSAR, Appendix A, vill be evaluated except as follows:
A.
Radioactive vaste treat =ent piping evaluatien vill be confined to the gaseous syste= with the exception of a portien of thz liquid discharge release line, plus related contain=ent penetrations.
1052 057
3 3.
Plant instru=ent air piping evaluation vin be confined to the high-pressure air-operated valve syste= and containment penetrations.
Appendix 3 of this response lists the syste= drawings which include the specific lines being evaluated.
IV.
SCHEDULE FOR INSPECTION OF SYSTELS Appendix 3, lists those syste=s which have portions of seis=ic piping.
Appendix 3 also categori::es inspection of that portion of the syste= vhich has seismic piping as fo11cvs:
Category A - Inspection of "nor= ally accessible redundant portions will be co=pleted by August 31, 1979 The re=ainder of seis=ic piping vin be ec=pleted by October 30, 1979 Category 3 - Seismic piping portion of the syste= not *nor=any available. Inspection vin be ec=pleted by Cetcber 30, 1979 Category C - Nonredundant system. Inspection of *=cr: ally accessible seis=ic piping vin be ec=pleted by August 31, 1979 The re=ainder of the syste= vin be inspected by October 30, 1979
'Nor= ally accessible is defined (for these purposes) as syste=s that are outside contain=ent in radiation fields of less than 100 =r/h and less than 80% cf naxi=u permissible airborne concentration.
The Palisades Nuclear Plant is now scheduled for a refueling outage be6 n-1 ning in Septe=ber 1979 The October 30, 1979 date vin be extended to coincide with the end of the refueling cutage, if the outage ends after October 30, 1979 1052 058
A-1 APPENDIX A PIPING COMPOSITE DRAWINGS FOR PALISADES Draving Number Revision Date Title M,-16 12 h-6-79 Area Plan of n 590'-0" M-17 10 10-22-Th Area 1 Plan of n 60T'-0" M-18 9
6-B-TT Area 1 Plan of H 6k9'-0" M-19 7
10-22-Th Area 1 Plan of E 700'-0" M-20 9
8-11-78 Area 1 Section A-A Lover M-22 8
10-22-Th Area 1 Sections 3-B and C-C M-2k 12 '.
8-29-78 Area 1 Sections F-?, G-G and H-H M-25 15 6-8-79 Area 2 Plan of n 570'0" (M-63h)
M-26 12 1-26-79 Area 2 Plan of E 590'-0" (M-635)
M-27 12 3-14-79 Area 2 Plan of n 602'-0" (M-636)
M-28 12 11-lh-T8 Area 2 Plan of n 611'-0" (M-637)
M-29 11 11-lh-78 Area 2 Plan of E 625'-0" M-31 14 6-8-79 Area 2 Sections M-3h 6
10-22-Th Area 2 Sections M-38 23 9-14-78 Area 3 Plan of a 590'-0" (M-699)
M-39 20 3-5-79 Area 3 Plan of n 607'-0" M-k0 23 6-8-79 Area 3 Plan of n 625'-0" (M-6h5)
A-42 26 8-30-78 Area 3 Section M-h3 11 10-22-74 Area h Plan of El 590'-0" M-52 14 1-24-78 Area 6 Plan of E 570'-0" and Sections M-59 8
T-13-TT Area T Plan of E 590'-0" and Sections M-61 7
8-22-78 Area 8 Plan of n 590'-0" M-63 11 9-15-76 Aree 9 Plan and Section M-65 10 1C-22-74 Pi ing Drawing Main Stes= Systes P
M-73 9
10-22-74 Undergrcund pip ng Turbine 3uilding i
M-63h 2
10-30-Th Area 2 Plan of E 570'-0" (M-25)
M-635 11 1-26-79 Area 2 Plan of n 590'-0" (M-26)
M-639 5
1-26-79 Area 2 Sections M-ch5 h
10-30-78 Area 3 Plan of n 625'-0" and Sections 1052 059
r 3-1 APPENDIT 3 SYSTD1 DRNIIUGS, DESCRI? TION AND INS?ECTICH CAMRY Fifteen copies of drawings are being provided to facilitate NRC review. These drawings have the system name and "MEI?" prefix prior to the nu=erical designa-tion; eg, MEXP-201 shows the safety piping to be inspected for the Prd-a 7 Coolant Syste=, P&I M-201.
The MIXP series of drawings are being used.for evaluation per IE Bulletin 79-02 as ven as II Sunetin 79-14. Also, the MEXP series drawings denotes 2-inch and under piping as safety-related; however, 2-inch and under piping is excluded from the evaluation being performed for IE Bulletin 79-14.
Inspection Dravinz System Descrintion Category M-201 Prir.ary Coolant Systen 3
M-202 Che=ical Volu=e Control A
M-203 and Safety Injection, Contain=ent Spray M-20h Shutdown Cooling A
M-205 Main Steam and Auxiliary Turbine Systes A
M-207 Feedvater and Condensate Syste=
A M-208 Service Water System A
M-209 Cc=ponent Cooling Water Systes A
M-210 Radvaste Treat =ent Systes - Clean C
M-211 Radvaste Treat =ent Syste: - Dirty and Gaseous C
M-212 Service and Instru=ent Air C
M-213 Circulating Water, Screen Structure Chlorination and Fire Syste=
A M-21h Lube Cil, Fuel Oil and Diesel Generator A
M-215 Plant Heating System A
M-213 27AC System A
M-219 Sa=pling Syste:
C 1052 060
3-2 Inspection Drawing System De;cription CateTory M-220 Makeup '4ater, Do=estic '4ater and Che=ical Injection C
M-221 Spent Fuel Fool Coolant and Shield Cooling Syste=
A M-222 Miscellaneous Gas Supply Syste:
C M-224 Gas Analyzing Syste=
C M-225 High-Pressure Air-operated valves C
M-226 Stea= Generator 31ovdown Modification C
M-650 Radwaste Ivaporator Syste= - Clean Wastes C
M-651 Radvaste Ivaporator Syste= - Miscellaneous Wastes C
1052 061
.