ML19208D137
| ML19208D137 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/26/1979 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| U-0100, U-100, NUDOCS 7909280032 | |
| Download: ML19208D137 (1) | |
Text
-h
~
U-0100 ILLIN0/S POWEl? COMPANY a g C. LOO ~ISNOI'20)~O h_*j 500 SOUTH 27TH STREET, DECATUR, ILUNOIS 62525
~
July 26, 1979 Mr. James G. Keppler Director, Region III Office of Inspection & Enforcement U. S. Nuclear Regulatory Commicsiton 799 Roosevelt Road' Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in reply to your letter of May 22, 1979, whereby you forwarded IE Bulletin No. 79-11 which reported on a problem en-countered with faulty overcurrent trip devices in circuit breakers.
Please be advised that Westinghouse DB-75 and DB-50 circuit breakers will not be used with any safety related services at the Clinton Power Station.
Sincerely, G. E. Wuller Supervisor - Licensing Generation Engineering Department GEW/jh Director, Division of Reactor Operations Inspection cc:
Office of Inspection & Enforcement, USNRC 1051 185 g\\2o'$1B IU 0928 0037
_