ML19208C870
| ML19208C870 | |
| Person / Time | |
|---|---|
| Issue date: | 08/20/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19208C871 | List: |
| References | |
| TAC-6342, NUDOCS 7909270595 | |
| Download: ML19208C870 (1) | |
Text
'
pa na
(
s 7o, UNITED STATES l
5*)s.
i NUCLEAR REGULATORY COMMISSION E
WASHINGTON. D. C. 20555 o
8
\\% /
AUG 2 01979 MEMORANDUM FOR:
Ippolito, Chief, Operating Reactors Branch #3 Division of Operating Reactors FRLM:
G. Lainas, Chief, Plant Systems Branch Division of Operating Reactors
SUBJECT:
STATUS OF BWR LICEN3EE COM'iITMENTS TO INSTALL ATW5
' RECIRCULATION PUMP TRIPS (TAC G342)
By letters dated January 8,1979 to all BWR licensees that currently do not have ATWS recirculation pump trips (RPT's) installed, DOR requested install-ation of RPT's. At the request of V. Rooney (ORB #3), the Plant Systems Branch and our consultant, Lawrence Livermore Laboratory, evaluated the licensee responses to determine compliance with our January 8,1979 letter.
A summary of the BWR licensees' comitments to ir stall recirculation pump trips is enclosed.
All of the licensees have committed to the overall 00R objective of ensuring that an acceptable RPT system be installed at each BWR facility within two years of receipt of the Januar v 1979 letter.
We find this acceptable.
Tdw G.
ainas, Chief Plant Systems Branch Division of Operating Reactors
Enclosure:
As stated cc:
D. Eisenhu:
B. Grimes W. Gammill R. Vollmer D. Ziemann V. Rooney V. Stello S. Hanauer A. Thadani P. Check 70 M9 T Novak
- 3. Lainas D. Tondi P. Shemanski PSB, Section ^
7 909270@g