AECM-79-102, Forwards Final Deficiency Rept 79/09
| ML19208C782 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/18/1979 |
| From: | Dale L MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19208C783 | List: |
| References | |
| AECM-79-102, NUDOCS 7909270494 | |
| Download: ML19208C782 (1) | |
Text
i l
1 l
gu'c,Gbt/
+
T![
a MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi n
P. O. B O X 1640, J AC K S O N, MIS SIS SIP PI 3 9 29 5 P4ODUC710N DEPAR? MENT
@.yy Office of Inspection & Enforcement SePterrber 18, 1979 U. S. Nuclear Regulatory Commission
.3 m
~
Region II j
'O 101 Marietta Street - Suite 3100 At3anta, Georgia 30303 T
ATTENTION:
Mr. J. I. O'Reilly, Director
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station File 0272/0498/15525 Jinal Report for PRD-79/09 as Defined in 10 CFR 50.55(e)
AECM-79/102 On April 18, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site concerning elbow fittings with incorrect carbon content. The deficiency concerns a problem with material provi;ed by U. S. Steel Corporation utilized by our supplier to manufacture elbow fittings.
We have determined that this matter is reportable within the criteria o f 10 CFR 50.55 (e). Details of our findings are described in the attached final report.
Yours truly, L. F. Dale Nuclear Project Manager JRF/pa Attachment cc:
Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. John G. Davis, Director Divisien of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 o\\a\\
\\
y 909270
$ /79CcM[
Member Midd;e South Utilities System
- CULCOPy 3'049 001