ML19208C088

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text
ML19208C088
Person / Time
Site: University of New Mexico
Issue date: 09/07/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Whan G
NEW MEXICO, UNIV. OF, ALBUQUERQUE, NM
References
NUDOCS 7909240677
Download: ML19208C088 (1)


Text

...__.___y CEtlTRAL FILES

.,, t o y,b, UNITED STATES

[',g NUCLEAR REGULATORY COMMISSION E ', ' g/ [E f

REGION IV

.g o,, -

h

%,'b'[o#

611 RYAN PLAZA oRIVE, SUITE 1000 ARLINGTON, TEXAS 76012 September 7, 1979 In Reply Refer To:

Docket No. 50-252 The University of New Mexico ATTN:

Dr. G. A. Whan Reactor Supervisor Chemical & Nuclear Engineering Department Albuquerque, New Mexico 87131 Gentlemen:

With this IE Information Notice, the Nuclear Regulatory Commission is ex-tending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.

This IE Information Notice is being reissued to correct a word om1ssion and a punctuation error that, when t aken together, completely changed the intent of a statement. The changed statement is underlined in the text of the IE Information Notice.

It is requested that the facility licensee provide copies of this IE Information kotice to all NRC licensed individuals at the facility. No specific responsc is requested at this tine.

If you have questions regarding this matter please contact the Director of the appropriate NRC Regional Office.

Sincerely, e

!{!

  • Y

' hA lj;f Q

r Karl V. Seyf rit [,/,

Director

Enclosures:

1.

IE Information Notice No. 79-20, Rev. 1 2.

List of IE Information Notices Issued in 1979 1012 276 7900240 6 7 7

)90[DOof d [

UNITED STATES NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-20, Rev. 1 Date:

September 7, 1979 Page 1 of 3 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS

Background:

In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.

These items of noncompliance

-can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.

~

The purpose of this Information Notice is two-fold:

1.

To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures; and 2.

To summarize the enforcement sanctions available to the NRC for use against licensed individuals.

Description of Circumstances:

1.

Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected. The role of NRC licensed individuals is no less important in the overall Regulatory scheme.

The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety.

Reliance on these actions is a part of the defense-in-depth concept.

Specifically, the NRC requires that:

(1) Only licensed operators art r-#***d * ^ '"" i * ' l a t e the controls that directly affect react.

DUPLICATE DOCUMENT 012 277 (2) Licensed operators are regi l

all times during the opera.

Entire document previously entered into system under:

\\

anO 77C)%930/o3 l

No. of pages:

/~)

1 m