ML19208B946

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text
ML19208B946
Person / Time
Site: West Valley Demonstration Project, 07000959
Issue date: 09/07/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Deuster R
NUCLEAR FUEL SERVICES, INC.
References
NUDOCS 7909240208
Download: ML19208B946 (1)


Text

cp>* "'%e M

y y

,g UNITED STATES y '

  1. c g

NUCLEAR REGULATORY COMMISSION E

REGION 1

.. 8 0,

631 PARK AVENUE 8

w

,o KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-201 SEP 7 m3 70-959 Nuclear Fuel Services, Incorporated ATTN: Mr. R. W. Deuster President Suite 600 6000 Executive Boulevard Rockville, Maryland 20352 Gentlemen:

With this Infomation Notice the Nuclear Regulatory Commission is extending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensces of significant events which could impact on conditions of their NRC licenses. This Information Notice is being reissued to correct a word omission and a punctuation error that, when taken together, completely changed the intent of a statement.

The changed state-ment is underlined in the text of the Information Notice.

It is requested that the facility licensee provide copies of this Information Notice to all NRC licensed individuals at the facility.

No specific response is requested at this time.

If you have questions regarding this matter please contact the Director of the appropriate NRC Regional Office.

Sincerely,

)

(

odNV

~~~D ecto

Enclosures:

1.

IE Infomation Notice No. 79-20, Revision 1 2.

List of IE Infomation Notices Issued in the Last Six Months cc w/encls :

J. P. Duckworth, General Manager 3,o b 89'M 7 9 09 24 h) 6

.)

ENCLOSURE 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 IE Information Notice No. 79-20 Revision 1 Date:

September 7, 1979 Page 1 of 3 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS

Background:

In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.

These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures.

Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.

The purpose of this Information Notice is two-fold:

(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures, and (2) To summarize the enforcement sanctions available to the NRC for use against licensed individuals.

Description of Circumstances:

1.

Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordan.c: with NRC requirements to assure that public health and safety are pro acted.

The role of NRC licensed individuals is no less important in the overall Regulatory scheme.

The NRC recognizes that timely actions by NRC licensed individuals are an important part of safety.

Reliance on these actions is a part of the defense-in-depth concept.

Specifically, the NRC requires that:

(1) Only licensed operators are permitted to manipulate the controls tFat directly affect reactiv'+' N " " " " " " " "

l (2) Licensed operators are requi1 DUPLICATE DOCUMENT times during the operation o 9903Cjf

, Entire document previously entered Einto system under:

7hd M2O/dh ANO j

No. of pages:

Lm -

1