b$

'b

[ h [ behhb)bbh

~< ccwcicursarawa =t w=,4w p,o, gjax 270 N.U[$l$

HARTFORD, CONNECTICUT 06101 r.wo.,

,k k =, 3',,,:Z, L"2. 27lc".-

( * *"

y

,,.s m.

.m.-

September 17, 1979 f4P 1298 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. fluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Provisional. License No. DPR-21 Docket flo. 50-245 Reportable Occurrence R0-79-26/lP

Dear Mr. Grier:

This letter is forwarded to provide prompt notification of Reportable Occurrence R0-79-26/lP as required by the Hillstone Unit 1 Technical Specifications.

On September 14,1979 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> a situation, not specifically considered in the safety analysis report or technical specificaticas that required corrective measures to prevent the existence of an unsafe condition, was

. discovered. After a review of control circuitry and logic associated with the 4100 volt breakers and their relationship to the loss of normal power scheme, it became apparent that the failure of a bus tie breaker during certain unit conditions could result in a loss of nomal power to the emergency buses. This situation has been cc ected and further infomation will be included in the required 14 cay follow-up report.

Yours truly, (pd ohn F. Opeka Station Superintendent Millstone fluclear Power Station JF0/PJP:llm