ML19208B463

From kanterella
Jump to navigation Jump to search
Forwards LER 79-100/03L-0
Date released: 08/10/2019 Download: ML19208B463


LER 79-100/03L-0:on 790905,while at 89% Power During Load Increase,Critical Mass Peaking Factor Was 2.57,exceeding 2.38 Limit.Computer Update Did Not Correct Problem.Caused by Inadequate Personnel Action
ML19208B464
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/17/1979
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208B464 (2)
Forwards LER 79-100/03L-0
ML19208B462
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/17/1979
From: Manry M
GEORGIA POWER CO.
To: O REILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208B462 (1)