e TENNESSEE ; VALLEY AUTHORITY cHATTAw56GA. TENNESSEE 374ot 400 Chestnut Street Tower II
'y' k
4
- Sb 4
i July 31, 1979 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Enclosed is our final response to C. E. Murphy's July 11, 1979, letter, RII:WPK 50-553/79-07, 50-554/79-07, regarding activities at Phipps Bend Nuclear Plant which appeared to have been in violation of NRC regulations.
We have reviewed the subject inspection report and find no proprietary information in it.
If you have any questions regarding this matter, please call Tish Jenkins at FIS 854-2014.
Very truly yours, TENhT.SSEE VALLEY AUTHORITY Ik
/
L. M. H, ills, Manager Nuclear Regulation and Safety Enclosure 79092000'94 o r,9
- 1. O B v:!:a. a. : ~.
ENCLOSURE FINAL RESPONSE TO RRC-0IE LETTER FROM C. E. MURPHY TO H. G. PARRIS DATED JULY 11, 1979 (REFERENCE RII:WPK 50-553/79-07, 50-554/79-07)
This report responds to the following Notice of Violation described in50-553/79 Appendix A of IE Inspection Report RII:WPK This is the final report on these infractions.
553-79-07-02 and 554-79-07-02.
Noncompliance Item - Infraction -
As required by 10CFR50 Appendix B Criterion V and implemented by Phipps Bend PSAR Paragraph 17.1A.5, activities affec A.
in accordance with those procedures.
Phipps Bend Construction Engineering Procedure CEP-12.01 " Control of Measuring and Test Equipment" requires equipment past due for calibration not to be used and to be so tagged.
Contrary to the above, on June 27, 1979, in weld material issue station No. I an electrode holding oven was in operation with its thermometer past the calibraica due date and an electrode baking oven past the calibration due date not properly tagged.
This is an it.f raction.
Response
Corrective Steps Taken and Results Achieved 1.
I The electrode holding oven in weld material issue station No.
was taken out of service immediately the morning the NRC inspector The oven ther-found the thermometer overdue for recalibration.and was found to be 29, 1979, someter was recalibrated on June within the specified range.
The electrode baking oven was tagged "out of calibration - do not l
use" immediately the morning the NRC inspector found it improper y It was recalibrated on This oven had never been used.
tagged.
and found to be within the specified range.
June 29, 1979, ofO HOI
- G1
2.
Corrective Steps Taken to Avoid Further Noncompliance Quality Control Welding personnel operating the weld material issue stations have been required to confirm complete knowledge of CEP 12.01, " Control of Measuring and Test Equipment."
Emphasis has been placed on the necessity of their continually monitoring oven thermometer recalibration due dates. They have been instructed to discontinue use of each electrode oven before the arrival of its recalibration due date and to tag that oven "Out of Calibration - Do Not Use."
3.
Date When Full Compliance was Achieved Full compliance was achieved on June 29, 1979.
Noncompliance Item - Deficiency - 553-79-07-03 and 554-79-07-03 As required by 10CFR50 Appendix B, Criterion IX and implemented by B.
Phipps Bend PSAR Paragraph 17.lA.9, measures shall be established to assure that special processes including welding be accomplished using qualified procedures in accordance with applicable codes.
Paragraph QW-201.1 of ASME Section IX requires that Welding Pro-cedures Specifications must list specific facts involved in qualifying a weld procedure specification.
Contrary to the above, on June 28, 1979, the code required spe.cific fact, (nonessential variable), " width, frequency, or dwell time of oscillation" was not addressed in Welding Procedure.
Specifications for the Gas Tungsten Arc and Gas Metal Arc Velding Processes.
This is a deficiency.
Response
1.
Corrective Steps Taken and Results Achieved The referenced nonessential variable QW410.7 of ASME Section IX,
" width, frequency, or dwell time of oscillation" exists for welding in which a machine controls this variable.
Please refer to ASHI Section IX and AWS A3.0 for definition of these However, to avoid conflict, we have amended the TVA terms.
General Construction Procedure Specification, G-29, to allow no oscillation unless specified for automatic welding.
2.
Corrective Steps Taken to Avoid Further Noncompliance The above changes to G-29 should prevent future misunderstandings on this item.
\\
n 6Q
/
i
)
pate Wen Full Compliance was Achieved 7
i ndcrstandings 3
to avoid futuro m sulks /nce with applicable 29, 1979, G-29 was amended June althouE'webelieveourprogramwasincomp[
specifications at the time.