ML19208B290

From kanterella
Jump to navigation Jump to search
Interim Rept 3 for Potential Reportable Deficiency 79/05: GE Has Issued Field Deviation Disposition Request Re Changes in Wire & Cable Lists.All Termination Cabinet Panels at Site Are Being Reviewed.Final Rept by 791130
ML19208B290
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/31/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-79-97, NUDOCS 7909190475
Download: ML19208B290 (1)


Text

.

  • l ll/IISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi

i '

EmblabhidenE P. O. B O X 16 40, J AC K S O N. MIS SIS SIP PI 3 9 20 5 n oooc n o,. Ec3 e ; ;. e A10 <l b Office of Inspection & Enforcement August 31, 1979 U. S. Nuclear Regulatory Co= mission Region II 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303 ATTENTION: Mr. J. P. O'Reilly, Lirector

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Statioa File 0270/15525/15526 Potential Reportable Deficiency No. 79/05 - Interim Report No.

3 AECM-79/97 On February 23, 1979, Mississippi Power & Light Company notified Mr. W. B. Kenna of your of fice, of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site. The daficiency concerns improper drawings supplied by the General Electric Company.

General Electric has issued a Field Deviation Disposition Request (FDDR) calling for changes in wire and cable lists. Consequently, all termination cabinet panels at the site are being reviewed against as-shipped drawings.

We expect to submit the findings of this review in a final report by November 30, 1979.

Yours truly, L. F. Dale Nuclear Project Manager JRF/pa cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. John G. Davis, Director k

Division of Inspection & Enforcement U. S. Nuclear Regulatory Coc: mission ^ 7 ]l 78'/ \/

go(9 \D Washington, D. C. 20555 79091904'76 8 Member Middle South Utilities System 7,90Ml gpt.