Interim Rept 2 for Potential Reportable Deficiency 79/09 Re Elbow Fittings W/Incorrect Carbon Content.Investigation in Progress.Final Rept by 791130
ML19208B282
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/27/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-79-92, NUDOCS 7909190464
Download: ML19208B282 (1)


Text

'l MISSIUShPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 40. J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 nj ' ?7 A!0 : 1I PRODUCTICN DEPAmTuENT Office of Inspection and Enforcement U. S. Nuclear Regulatory Cocnission Region II - Suite 818 230 Peachtree Street, N. W.

Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Director Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station File 0270/0498/15525 Interim Report No. 2 for PRD-79/09 As Defined in 10 CFR 50.55(e)

AECM-79/92 On April 18, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site concerning elbow fittings with incorrect carbon content.

The investigation has not been completed to determine the location of the elbows and the subsequent evaluation of the consequences had such a condition remained undetected. Therefore, our final report and deter-mination of reportability will be provided to you by November 30, 1979.

Very truly yours, L. F. Dale Nuclear Project Manager LFD:mic O'k O cc:

Mr. N. L. S tampley 4,

Mr. R. B. McGehee g

Mr. T. B. Conner Mr. John G. Davis, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

,,,7

}b 7909190 W 7

],ggy Member Middle South Utilizies System

'