Responds to NRC Re Violations Noted in IE Insp Rept 50-322/79-05.Corrective Actions:All Engineering QA Procedures Are Being Reviewed,Revised & Reissued to Reflect Organization Mods
ML19208B115
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/24/1979
From: Wofford A
LONG ISLAND LIGHTING CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19208B109 List:
References
SNRC-393, NUDOCS 7909190065
Download: ML19208B115 (2)


Text

.

MC,_'O q LONG ISLAND LIGHTING COMPANY 175 EAST OLD COUNTRY ROAD. H I C K S V I L L E, NEW YORK 11801 ANDREW w. wCFropo vics,....oc r

SNRC 393 May 24, 1979 Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 NRC Inspection No. 79-05 Shoreham Nuclear Power Station - Unit No. 1 Docket No. 50-322

Dear Mr. Brunner:

This letter responds to your letter of May 4, 1979, which forwarded the report of the inspection of activities authorized by NRC License No. CPPP 95, conducted by Mr. Napuda of your office on March 27-30, 1979.

The letter stated that it appeared that one of our activities was not conducted in full compliance with NRC requirements.

The apparent noncom-pliance and our response follow:

Apparent Noncompliance with 10CFR50, Appendix B, Criterion V, FSAR Section 17.1.6A and EQAP 5.1 Contrary to the above, as of March 30, 1979, a number of Engineering Quality Assurance Procedures (EQAP 's) had not been updated though their respective Change Notices were in effect in excess of a calendar year.

Corrective Action and Results All Engineering Quality Assurance Procedures (EQAP's) are being reviewed, revised and reissued as Quality Assurance Procedures (QAP's) to reflect the changes mandated by a recent change in the LILCO organization for Quality Assurance.

Appli-cable Change Notices are being reviewed with each Procedure and will be incorporated into the Procedure or cancelled, as appro-priate, during the review 7 9 0919 ()CGC

')] \\

v cJ, u

!U

NO ISL.kND 1.JGHTING COMPANY Mr. Eldon J. Brunner May 24, 1979 Page Two Stepe Taken to Prevent Recurrence The revised QAP 5.1, Quality Assurance Procedures, Instructions, Memoranda and Change Notices, will require that all effective Change Notices be reviewed annually with the applicable QAP and incorporated into the Procedure or cancel-led, as appropriate, at that time.

Date Full Compliance Will Be Achieved Full compliance will be achieved by July 31, 1979.

Very truly yours,

)

- i g,ufw [u. (c a c '.r. - Lc

~

Andrew W. Wof ford -

Vice President

'. 6 6 272

.