I
'o UNITED STATES 3,(3E,,g NUCLEAR REGULATORY COMMISSION i 7[C l'
'jg e REGION lil 8
o, t
799 ROCsEvELT ROAD
% '\\/
o GLErl E LLYN. eLLINOls 60137 July 31, 1979 Robert S. Ryan, Director Ohio Department of Energy 30 Ecst Broad Street - 34th Floor Columbus, Ohio 43215
Dear Mr. Ryan:
This refers to your letter dated June 25, 1979, with enclosures, which raised questions regarding the adequacy of construction at the Zimmer Plant. We share your interest and concern in knowing that this plant is built according to regulatory requirements.
The enclosed copy of our response to Mr. Rosenblum of the Ohio Public Utilities Commission provides information on our handling of the concerns brought to our attention by Mr. Martin.
Please let me know if you have additional questions regarding this matter.
Sincerely, N !
e James G. Keppler l
Director cc w/encts:
J. R. Schott, Plant Superintendent Central Files Reproduction Unit NRC 20b PDR Local POR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Citizens Against e Radioactive Environment Helen W. Evans, State of Ohio
\\@
c;6,1 19091805f[
[
o
["),(fg NUCLEAR REGULATORY COMMISSION UNITED STATES
~/a a o
REGION lli
\\/
799 roosevelt ROAD e
GLEN ELLYN, ILLINols 60137 JdL 3 1 19 D Mr Donn D. Rosenblum Stare of Ohio Public Utilities Commission 180 East Broad Street Columbus, Ohio 43215
Dear Mr. Rosenblum:
I Thank you for your letter of June 20, 1979, construction workers at the Zimmer Nuclear Power plant site. transmitting affidavits from viously received these effidavits and the Region III staff has been We had pre-In addition, these issues have been transmitted to the the Zimmer plant and have been, or wiLL be discussed during the hearing process.
review of these matters and statements made to the Hearing and our review is still in progress. time, the comments regarding meta At this when our review is completed.
We will send you a copy of the report We responded to Mr. Martin following our review of the concerns expressed in his affidavit, and explained our findings to him.
the findings in Inspection and Enforcement Inspection Rep (Section 10, which includes information regarding containm
. 50-358/79-09 valves at the Zimmer plant.
ent isolation the use of a single isol3 tion valve for some piping, as detailed in the inspection report.
We believe that our revi?w of each issue was of sufficient depth to identif any safety problem.
However, we will respond to any further concerns y
brought to our attention to assure that we have not overlooked any signifi-cant deficiencies.
\\ O' 7 L.
a
,4r 772Crb?E7f
~
~
Donn D. Rosenblum 2
31I372 e
If you have further questions regarding these matters, or regarding the attached reports, please feel free to contact our office.
Sincerely, o.By James G. Keppler Director
Enclosures:
1.
Inspection Rpt. No. 358/79-06 2.
Inspection Rpt. No. 358/79-09 3.
Statements made by T. Vandel 4.
Statements made by F. Maura cc w/ enclosures:
Thomas D. Martin Robert S. Ryan, Ohio Department of Energy J. R. Schott, Plant Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Citizens Against a Radioactive Environment Helen W. Evans, State of Ohio