ML19208A931
Jump to navigation
Jump to search
| ML19208A931 | |
| Person / Time | |
|---|---|
| Site: | Crane, Davis Besse |
| Issue date: | 11/21/1977 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19208A929 | List: |
| References | |
| 50-346-77-32, NUDOCS 7909180308 | |
| Download: ML19208A931 (1) | |
Text
'
l l
Appendix A i
}
Toledo Edison Company Docket No.
0-346 Eased on the inspection conducted Septe ber 26-30, October 5-7, 18-21, and 27, 1977, it appears that certain of your activities were in nonco=pliance with NRC requirerents below.
The it,ec is a deficiency.
Contrary to the approved Quality Assurance Manual and Criterion V of 10 CFR 50, Appandix B, Administrative Procedure 1823.00 ras not completely adhered to in the logging and review of ju=per - lift wires.
i t
\\l
{
i e
a
(
s 4
c 6
1 s
I t,
7909180 % T I
a i
E*
RV
)=
- 'Pb u 3 $ ? )O' A +
.. G