ML19208A627

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0371/79-06 on 790312-16.No Noncompliance Noted.Major Areas Inspected:Implementation of Accepted Security Plan
ML19208A627
Person / Time
Site: 07000371
Issue date: 07/02/1979
From: Devlin J, Shepherd R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19208A623 List:
References
70-0731-79-06, 70-731-79-6, NUDOCS 7909170097
Download: ML19208A627 (1)


Text

U.S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT Region I Report No.

70-371/79-06 Docket No.70-371 Safeguards Group 1

Category UR License No.

SNM-368 Priority Licensee:

United Nuclear Corporation 67 Sandy Desert Road Uncasville, Connecticut 06382 Facility Name:

Naval Products Division Inspection at:

Uncasville, Connecticut Inspection conducted:

March 12-16,1979 I-3-77 Inspectors:

c-//

R. E. Shepherd, Physical Security date signed

  1. fbd S-E-71 R. H. Ladun,' Physical Security date signed Inspector date signed 7f Approved by:

//

A w

J. W7 D'evlin, Chief, Security and

'date sfgned nvestigation Section, Safeguards Branch Inspection Summary:

Inspection on March 12-16,1979 (Report No. 70-371/79-06)

Areas Inspected:

Routine, unannounced Physical Protection Inspection by regional based inspectors of the implementation of the licensee's accepted Security Plan and 10 CFR 73.50,10 CFR 73.60 and 10 CFR 73.70 relative to security organization; access controls; detection aids; response controls; testing and maintenance; SNM protection; and reports of incidents.

Followup on IE Circular No. 79-03 related to guard qualification and training records.

The inspection started during off-shift hours and involved 60 inspector-hours onsite by two NRC regional based inspectors.

Results:

Of the eight areas inspected, no items of noncompliance were identified.

3b12U?

Region I Form 12 (Rev. April 77) 909170 Oi7