MONTHYEARML17229A7861998-06-16016 June 1998 Rev 2 to Cable Derating in Conduits W/Fire Barrier Coatings. ML17309A9491998-06-0202 June 1998 Rev 0 to Electrical Cable Ampacity Correction Factors for Thermo-Lag Fire Barriers. ML17309A8961997-06-11011 June 1997 Non-proprietary Rev 0 to ST-257, Structural Evaluation of St Lucie SG Package. IR 05000335/19960041997-05-23023 May 1997 Partially Withheld Draft Ltr Forwarding Draft Insp Repts 50-335/96-04 & 50-389/96-04 on 960218-0330 & Draft Notice of Violation ML20148E8881997-05-21021 May 1997 Monthly Performance Monitoring Audit QSL-PM-96-08, May/June 1996. Encl Partially Deleted ML20141J0861997-05-19019 May 1997 Undated Partially Deleted Package Re Allegation Mgt Sys for Plant.Functional Areas,Including Operations,Safeguards, Offsite Health & Safety & Onsite Health & Safety Discussed ML20137M4951997-04-0101 April 1997 Undated,QSL-MR-96-14, Maint Rule Compliance ML17354A4291997-03-0707 March 1997 Ampacity Derating Response to NRC GL 92-08 for Cables Routed in Conduit & Tray w/Thermo-Lag 330-1 Barrier Sys Coating. ML17354A4301997-03-0707 March 1997 Fire Barrier Acf for T-Lag 330-1/770-1 Assemblies. ML17354A4311997-03-0707 March 1997 Review of Ampacity Ratings for Power Cables in Conduits & Trays w/Thermo-Lag 330-1 Covering. ML17354A4321997-03-0707 March 1997 Ampacity Derating for Cables in Raceways & Boxes w/Thermo- Lag 330 & w/Thermo-Lag 330 W/Layer of Thermo-Lag 770 Fire Barrier Coating. ML17229A8641997-02-14014 February 1997 Rev 0 to MECH-0088, Transient Temp of SFP Following Full Core Offload. ML20133L8431997-01-21021 January 1997 Press Release II-97-12, NRC Chairman to Visit Turkey Point Will Meet W/Press at 1:00 Pm at Site ML20133E3251997-01-10010 January 1997 Press Release II-97-06, NRC Staff Proposes $100,000 Fines Against FPL at Slp ML20133D9801997-01-0707 January 1997 Calculation of Psl LOSP Initiator Event Frequency & Confidence Limits ML17229A1771996-12-18018 December 1996 Rev 1 to Cable Derating in Conduits W/Fire Barrier Coatings. ML20137K7711996-11-30030 November 1996 Monthly Performance Monitoring Audit for Oct/Nov 1996 ML20134M2121996-11-22022 November 1996 Press Release 96-165, NRC Begins First of Series of Design Insps at Nuclear Power Plants ML20134D7471996-10-30030 October 1996 Press Release II-96-89, NRC Schedules Special Insp Exit Meeting at St Lucie Plant,Nrc Also Schedules St Lucie Corrective Action Meeting in Atlanta ML20137L0031996-09-0909 September 1996 Monthly Performance Monitoring Audit for July to Aug 1996 ML17229A0941996-08-30030 August 1996 Rev a to SAIC 05-5049-05-6734-500, Steam Generator Degradation Specific Mgt Leakage Limit Calculation for St Lucie Unit 1. ML20137M2241996-07-0808 July 1996 QSL-PM-96-08, Monthly Performance Monitoring Audit, May/June 1996 ML18151A4141996-06-25025 June 1996 Addendum a to Rev 0 to ME-0498, Pressure Locking & Stem Effect Thermal Binding Analysis for GL 95-07. ML20137M5321996-04-19019 April 1996 QSL-SEC-96-03, Functional Area Audit of Security & Safeguards Info Control ML17229A1781996-04-10010 April 1996 Rev 0 to Fire Barrier Ampacity Correction Factors Extrapolation of Test Results for 3 Hour Barrier. ML20137M1771996-04-0202 April 1996 Audit Rept QSL-PM-96-02, Monthly Performance Monitoring Audit, Feb 1996 ML20137K9291996-04-0101 April 1996 Star/Pmai Conversion Process QSL-CA-96-05. W/Related Info ML20134B7421996-03-0808 March 1996 Event Tracking & Followup Assignment Sheet of 951106 Event Re Region Draft Info Notice Discussing Series of Difficulties at Plant W/Square D Series 8501 KPD-13 Relays Installed in RS11 Sockets ML20137M9071996-01-10010 January 1996 Quality Assurance Audit Rept QSL-OPS-95-22, Monthly Performance Monitoring Audit, Nov 1995 ML20141D7991996-01-0101 January 1996 Partially Deleted Package Consisting of Personnel Contaminations for 1995,rev 1 to Health Physics Procedure HPP-70,util inter-office Correspondence & Instrument & Control Info ML20137K9351995-09-15015 September 1995 Nuclear Engineering Audit,QAS-JPN-95-01,for June 1995 ML20134B6291995-09-0606 September 1995 Event Tracking & Assignment Sheets of 950818 Event Re Spray Down of Containment ML20134B6241995-08-0909 August 1995 Event Tracking & Follow Up Assignment Sheet of 950802 Event Re UE Declaration Resulting from Two Stages of Reactor Rc Pump Seal Failures w/2 Gpm Identified Leakage ML20137L0851995-08-0808 August 1995 Pmon Activities QAS-PMON-95-5 for June 1995. Related Info Encl ML20137M8031995-08-0303 August 1995 Quality Assurance Audit Rept QSL-OPS-95-10, Radiation Protection Functional Area Audit ML20137M7111995-07-25025 July 1995 Quality Assurance Audit Rept QAS-ENV-95-1, Radiological Environ Monitoring Program & Site Nonradiological Environ Protection Plans Functional Area Audit, 950525-0714 ML17228B2371995-07-14014 July 1995 Stresses for St Lucie Unit 2,PZR Lefm. ML17228B2351995-07-11011 July 1995 Fm Analysis of St Lucie Pressurizer Instrument Nozzle. ML18153A0131995-04-0303 April 1995 Rev 5 to ME-0465, Determination of Heat Transfer Impact to Lhsi Sump Recirculation Valves During Initial DBA Event. W/One Oversize Drawing ML20137M7631995-03-30030 March 1995 Quality Assurance Audit Rept QSL-OPS-95-04, Odcm,Pcp, Effluents Functional Area Audit ML17228B0481995-02-15015 February 1995 Nonproprietary Version of Stresses for St Lucie Unit 2 Pressurizer Lefm. ML17228B0471995-02-13013 February 1995 Nonproprietary Version of Fracture Mechanics Evaluation of St Lucie Pressurizer Instrument Nozzles. ML20134B5381994-11-10010 November 1994 Event Tracking Sheet Re 941023 Event Concerning Potential Containment Bypass Path Thru Lpsi/Naoh Addition Sys.Caused by Design or Installation Error ML20134B5161994-07-26026 July 1994 Event Tracking & follow-up Assignment Sheet of 940714 Event Re Failure of Trip Circuit Breaker 5 to Open ML20134B5611994-06-17017 June 1994 Event Tracking Sheet Re 930625 Event Involving Refueling Water Tank Corrosion ML20134B5351994-06-17017 June 1994 Event Tracking Sheet Re 930414 Event Involving Relay Failures ML20134B5021994-03-22022 March 1994 Package Consisting of Oeab Event Tracking Sheet Re 930416 Event ML20137K7451994-02-0808 February 1994 QA Audit of Turkey Point Design Control,Including Production Engineering Group ML20064K7521993-06-0808 June 1993 Package Consisting of St Lucie & Turkey Point 1992 Preliminary Llnl Hazard Estimates for Peak Acceleration ML20137K9661993-02-26026 February 1993 Rept of QA Audit for 921027-930204. Incomplete QA Audit Rept QSL-PCM-96-11 Encl 1998-06-02
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARML19208A6111979-07-26026 July 1979 Discusses Possibility of Obtaining Extension for Commitments Re Responses to IE Bulletin 79-06A ML20040C0551976-05-0101 May 1976 Summary of 760510 Telcon W/V Stello Re Program for Tube Denting Investigation & Status of Efforts to Date 1979-07-26
[Table view] |
Text
--
FLORIDA POWER $ LIGHT COMPANY f'CI TELEPHONE CONFERENCE MEMORANDUM --
7.; ': ,Q INCOMING X OUTGOING g 7 g DpTE; [ :!cev7 26.1979 WITH MR. R. J . Vogt-Lowel l OF THE USNRC WITH MR. OF i r1E R. J. Vogt-Lowell TIME COPIES TO:
H EY , J KH , DWJ , DWH COST CHARGE SUBJECT July 31, 1979 Procedure Revision Commitmer.ts FILE DETAILS OF CONFERENCE: 1 (wi th J.K. Hays and D.V. Jones in attendence) called Mr.
Vogt-Lowell to discuss the possibility of obtainina an extension in some of our connit-ments related to our responses to I & E Bulletin 79-06A. In our letter of June 25, 1979 to the NRC, FPL committed to revise the procedures affected by items 2 and 10 cf the i&E Bulletin 79-06A by July 31, 1979 In our letter of June 4, 1979 FPL committed to revise the procedures affected by items 8 and 10 of the I & E Bulletin 79-06A by July 31, 1979 We discussed the fact that completion of the proradure changes related to item 2 would not be possible until the issue of reactor coolant pump post-accident operation was resolved. Mr. Vogt-Lowell said an extension on that basis was acceptable providing a new commitment date was established. We committed to pomplete the item 2 procedure changes by August 31, 1979 With respect to the item 8 and 10 procedure changes, we stated we wished to clarify the commitments made in che June 4 and June 25 letters as ,
follows: The procedure changes would be draf ted by July 31, reviewed by tSe PNSC on August 1, 1979, and typed, approved and distributed as soon thereafter as possible, which would probably be within two or three weeks. Mr. Vogt-Lowell stated he felt this was an acceptable clarification of the commitment.
Mr. Vogt-Lowell then asked if we would provide him with documentation of this telephone call for his files. I responded that we would do so.
% 1223 IGNATURE WA r H . E(_.,XJd'ge r[ P 1 7909170 on. A \.