ML19208A524

From kanterella
Jump to navigation Jump to search
Forwards LER 79-099/03L-01
Date released: 08/10/2019 Download: ML19208A524


LER 79-099/03L-0:on 790829,while Performing HPCI Turbine Exhaust Diaphragm Pressure Switch Functional Test,Instrument 2E41-N012C Failed to Hold Pressure.Instruments 2E41-N012 a, B & D Were Inoperable.Caused by Switch Diaphragm Crack
ML19208A528
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/07/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208A528 (1)
Forwards LER 79-099/03L-01
ML19208A523
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/07/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208A523 (1)