ML19208A302

From kanterella
Jump to navigation Jump to search
Forwards LER 79-036/03L-0
Date released: 08/10/2019 Download: ML19208A302


LER 79-036/03L-0 on 790812:during Surveillance Test,Wide Range Nuclear Instrument Channel D Would Not Indicate Properly While in Calibr Mode.Apparently Caused by Bad Connection in Test & Power Cables.Connector Replaced
ML19208A309
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/11/1979
From: Davis S, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19208A309 (1)
Forwards LER 79-036/03L-0
ML19208A301
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/11/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19208A301 (1)