ML19207C494
| ML19207C494 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/14/1979 |
| From: | Ippolito T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19207C495 | List: |
| References | |
| NUDOCS 7909120041 | |
| Download: ML19207C494 (4) | |
Text
.
/
UNITED STATES P'4 NALEAR REGULATORY COMMISSION
=-f fI j WASHINGTON. D. C. 20555
+l t
ggv.....f GEORGIA POWER COMPANY OGLETHORPE EldCTRIC MEMBERSHIP YORPORATION MUNICIPAL ELECTRIC ASSOCIATION Of GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN 1. HATCH NUCLEAR PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 70 License No. DPR-57 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Georgia Power Company, et al.
(the licensee) dated May 22, 1979, as supplemented June 4 and 25, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-57 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendices A and "l\\
ul0 B, as revised through Amendment No. 70, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
t909120CT/
. 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
%)' #
Thomas Ippolito Chief Operating Reactors Branch #3 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: August 14, 1979
,9 '$
o) -.,
( lL r s
ATTACHMENT TO LICENSE AMENDMENT NO. 70 FACILITY OPERATING LICENSE N0. DPR-57 DOCKET NO. 50-321 Revise Appendix "A" as follows:
Remove pages 3.9-6a and 3.9-6b and replace with revised page 3.9-6a
( l [' 1 f
-, 7
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.D Electric Power Monitoring for the 4.9.D Electric Power Monitoring for Reactor Protection System Reactor Protection System Specifications:
Specifications:
1.
When either of the RPS MG sets or the 1.
The Electric Power Monitoring for Alternate Source is in service, its the Reactor Protection System power monitoring system shall be shall be demonstrated operable:
(a)
If the power monitoring system is (a) At least once per 6 months not OPERABLE and Operability by performing a FUNCTIONAL cannot be restored within 30
- TEST, minutes of discovery, remove the power supply from service immediately (b) At least once per operating thereafter.
cycle by demonstrating the OPERABILITY of under-voltage, (b) One channel of a power monitoring over-voltage and under-fre-system may be inoperable, as quency protective instrumenta-necessary for test or maintenance, tion by perfonnance of a CHANNEL not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per month.
CALIBRATION including simu-lated automatic actuation of the protective relays, trip-ping logic and output cir-cuit breakers and verifying the following setpoints:
(1) Over-voltage <l32 VAC, (2) Under-voltage 1108 VAC, with time delay relay set to zero*
(3) Under-frequency 157 Hz, with time delay relay set to zero*
- Pending NRC approval of different value.
Amendment No. 70 3.9-6a i[ /
'y, t
'q.