|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000302/LER-1983-015, Forwards LER 83-015/03L-01983-04-15015 April 1983 Forwards LER 83-015/03L-0 ML19330C7561980-08-0404 August 1980 Reapprises NRC of Withdrawal of CP Application for Facilities ML19330B4501980-07-28028 July 1980 Requests Return of 781220 Preliminary Physical Security Plan,Per 800517 Withdrawal of Application to Construct & Operate Facility ML19323E4201980-05-17017 May 1980 Informs That Joint Applicants Withdraw Application Before NRC to Construct & Operate Nuclear Plant Per Encl Civil Findings of Fact & Order ML19296B3461980-02-15015 February 1980 Provides Guarantee Under Retrospective Premium Sys.Forwards Documents Demonstrating Adequate Cash Flow.Excerpts from 1979 Annual Certified Financial Statements & 1980 Certified Cash Flow Projection Encl ML19257D8481980-01-31031 January 1980 Forwards Rept Re Expenditures & Commitments for Dec 1979 ML19260C7151979-12-28028 December 1979 Discusses Monthly Rept of Expenditures & Commitments. Requests That Repts Be Submitted Quarterly ML19210E3721979-11-29029 November 1979 Forwards Monthly Rept of Expenditures & Commitments in Connection W/Proposed Facility ML19250B9741979-10-26026 October 1979 Forwards Monthly Rept Re Expenditures & Commitments in Connection W/Proposed Facility ML19256E0331979-10-17017 October 1979 Responds to 790820 Request for Comments of State of Wi Dept of Natural Resources Re Amends 13 & 14 to Environ Rept for Proposed Facility.Comments Encl ML19254F4021979-10-16016 October 1979 Forwards Util 791010 Registration Statement Re Proposed Public Offering of Securities ML19209A5181979-09-26026 September 1979 Forwards Monthly Rept Re Expenditures & Commitments,In Accordance w/770916 & 780929 Instructions.Reflects Accounting Action Taken by Util as Result of NRC 790302 Order.W/Two Oversize Tables ML19262A1391979-09-17017 September 1979 Discusses Velocity Discrepancies of Fairfied Industries,Inc & Rj Wold Calculations of Depths of Rocktop & Subrock Reflectors in Eastern Lake Mi Faulting Studies.Changes Should Not Affect Basic Conclusions of Psar.Svc List Encl ML19249D9131979-09-17017 September 1979 Discusses Discrepancies in Velocities Used to Calculate Depths of Top Rock & Subrock Reflectors in PSAR Site Addendum Geophysical Rept.Site Addendum Will Be Amended to Incorporate Revised Maps.Certificate of Svc Encl ML19208B4741979-09-17017 September 1979 Requests Docketing of Encl Ltrs:Secure,Adequate,Future Energy 790802 Ltr,League Against Nuclear Dangers 790828 Submittal of Objections to Facility,Wi Job Svc 790802 Reply to Anl & Other Related Correspondence ML19208B2431979-09-14014 September 1979 Responds to NRC 790905 Request Re Endangered Species Info for Proposed Plant.Site Not within Known or Historic Range of Threatened,Endangered or Proposed Species ML19253A5831979-08-31031 August 1979 Forwards Listing of Financial Expenditures for Jul 1979 ML19207C3721979-08-31031 August 1979 Forwards Table Re Analysis of Earthquake Intensity at Site. Two of Three Equations Used for Attenuation Contained Errors Resulting in Overestimation of Average OBE Recurrence Intervals ML19273C1151979-08-20020 August 1979 Comments on Amends 13 & 14 to Environ Rept.Nonradioactive Floor & Equipment Drainage Should Not Be Treated at Sewage Treatment Plant.Addl Info Re Toxicity of Arsenic & Barium Should Be Provided ML19270H4701979-08-15015 August 1979 Submits Responses to Requests for Addl Info Re Review of PSAR ML19253A3191979-08-14014 August 1979 Forwards Addl Info Re Environ Rept in Response to 790710 Request ML19225C8061979-07-27027 July 1979 Submits Monthly Info Rept Re Expenditures & Commitments in Connection W/Proposed Haven Plant ML19242A4021979-07-25025 July 1979 Submits Joint Applicants Response to Wi Environ Decade,Inc 790705 Ltr Supplementing Earlier Motion to Dismiss Application or to Cease Expensing Capital Carrying Charges ML20125A7751979-07-0909 July 1979 Approves Withholding for Public Disclosure Per 10CFR2.790 Tables 240.2-2 & 240.2-3 Re Mass & Energy Release Rates & Main Steam Line Break ML19224D0771979-06-29029 June 1979 Forwards Monthly Rept Re Expenditures & Commitments Concerning Haven Nuclear Plant.Enrichment Prepayment Data Removed from Exhibit C ML19246A9931979-06-20020 June 1979 Forwards Addl Info Re Environ Rept,In Response to NRC 790515 Request ML19269E3941979-06-20020 June 1979 Forwards Response to NRC 790314 & 790419 Requests for Addl Info Re Alternative Site Studies ML19261D7941979-06-18018 June 1979 Forwards Complete Environ Rept,Including Amends 10 & 11 W/Errata & Amend 12 ML19261D7961979-06-18018 June 1979 Forwards Complete Environ Rept,Including Amends 10 & 11 W/Errata & Amend 12 ML19261D7951979-06-18018 June 1979 Forwards Complete Environ Rept,Including Amends 10 & 11 W/Errata & Amend 12 ML19269E7561979-06-12012 June 1979 Forwards FP Libertowicz 790625 Affidavit of Svc Affirming Distribution of PSAR Amend 18 & PSAR Site Addendum Amend 23 ML19268B7851979-06-0505 June 1979 Forwards Paper 24, Toward Universal Climatological Extreme Wind Distribution, by Hc Thom.Paper Was Requested in J Goll 790524 Telcon Re Response to NRC Question 372.6(2.3.1) ML19270G5171979-05-31031 May 1979 Forwards Amend 18 to PSAR ML19273B7311979-05-31031 May 1979 Forwards Amend 23 to Psar,For Insertion Into Site Addendum ML19270G4471979-05-29029 May 1979 Submits Addl Info on Const Runoff Settling Basins & Industrial Wastewater Treatment Facilities,In Response to 790406 Request ML19289F6371979-05-29029 May 1979 Forwards June 1979 Response to Dept of Natural Resources Specific Comments on Amends 11 & 12 Environ Rept. ML19270G0541979-04-13013 April 1979 Advises That ASLB Ref to Both Haven Units in Legal Documents Is Appropriate,Even Though Applicants Are Seeking for Only One Unit.Certificate of Svc Encl ML19270F8171979-03-23023 March 1979 Reviews Amend 12 to Er Covering Const Effects on Terrain, Vegetation & Wildlife,Intake Sys & Const of Transmission Lines ML19296A4291979-03-12012 March 1979 Forwards Response to 790216 Request for Addl Info Re Preliminary Physical Security Plan.Requests Withholding Plan (Ref 10CFR2.790) ML19263D8981979-03-0909 March 1979 Forwards Util 1978 Advance Plan in Response to 790301 Ltr to Burstein.Certificate of Svc Encl ML19283B7551979-03-0707 March 1979 Ack Receipt of NRC 790226 Ltr Forwarding Addl Requests for Info Re PSAR & Site Addendum.W/Exception of Items 130.27, 130.29 & 130.31,will Provide Responses to Requests by 790402 ML19263C7511979-02-24024 February 1979 Ack Receipt of NRC 790216 Ltr Requesting Addl Info Re Preliminary Physical Security Plan.Will Not Be Able to Respond by 790302,but Will Make Every Effort to Respond by 790316 ML19263C4891979-02-20020 February 1979 Responds to 790206 Ltr Requesting Addl Info for PSAR Review 790402.Five of 52 Requests May Not Be Available by 790402 ML19263C3981979-02-15015 February 1979 Forwards Annual Certified Financial Statements for 1978 & Certified Cash Flow Projection for 1979 W/Narrative Statement ML19269D0961979-02-14014 February 1979 Forwards Affidavit Affirming That Amend 17 to PSAR & Amend 20 to PSAR Site Addendum Have Been Served on Persons Designated on Encl List ML20002A0871979-01-30030 January 1979 Forwards Mass & Energy Release Rate Tables for Main Steam Line Break.Tables Are Part of Amend 17 to Psar,Only Table Headings Will Be Printed.Encl Withheld (Ref 10CFR2.790) ML19270F5081979-01-18018 January 1979 Forwards Amend 17 to PSAR ML19261B3121979-01-18018 January 1979 Forwards Amend 20 to Site Addendum to PSAR ML20002A0901979-01-11011 January 1979 Requests Encl Mass & Energy Release Rate Tables for Main Steam Line Break Be Withheld (Ref 10CFR2.790) ML19267A2811978-12-26026 December 1978 Submits Affidavit of FP Libertowicz Affirming That Amend 12 to Environ Rept Was Served to Svc List 1983-04-15
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000302/LER-1983-015, Forwards LER 83-015/03L-01983-04-15015 April 1983 Forwards LER 83-015/03L-0 ML19330C7561980-08-0404 August 1980 Reapprises NRC of Withdrawal of CP Application for Facilities ML19330B4501980-07-28028 July 1980 Requests Return of 781220 Preliminary Physical Security Plan,Per 800517 Withdrawal of Application to Construct & Operate Facility ML19323E4201980-05-17017 May 1980 Informs That Joint Applicants Withdraw Application Before NRC to Construct & Operate Nuclear Plant Per Encl Civil Findings of Fact & Order ML19296B3461980-02-15015 February 1980 Provides Guarantee Under Retrospective Premium Sys.Forwards Documents Demonstrating Adequate Cash Flow.Excerpts from 1979 Annual Certified Financial Statements & 1980 Certified Cash Flow Projection Encl ML19260C7151979-12-28028 December 1979 Discusses Monthly Rept of Expenditures & Commitments. Requests That Repts Be Submitted Quarterly ML19254F4021979-10-16016 October 1979 Forwards Util 791010 Registration Statement Re Proposed Public Offering of Securities ML19249D9131979-09-17017 September 1979 Discusses Discrepancies in Velocities Used to Calculate Depths of Top Rock & Subrock Reflectors in PSAR Site Addendum Geophysical Rept.Site Addendum Will Be Amended to Incorporate Revised Maps.Certificate of Svc Encl ML19208B4741979-09-17017 September 1979 Requests Docketing of Encl Ltrs:Secure,Adequate,Future Energy 790802 Ltr,League Against Nuclear Dangers 790828 Submittal of Objections to Facility,Wi Job Svc 790802 Reply to Anl & Other Related Correspondence ML19262A1391979-09-17017 September 1979 Discusses Velocity Discrepancies of Fairfied Industries,Inc & Rj Wold Calculations of Depths of Rocktop & Subrock Reflectors in Eastern Lake Mi Faulting Studies.Changes Should Not Affect Basic Conclusions of Psar.Svc List Encl ML19208B2431979-09-14014 September 1979 Responds to NRC 790905 Request Re Endangered Species Info for Proposed Plant.Site Not within Known or Historic Range of Threatened,Endangered or Proposed Species ML19207C3721979-08-31031 August 1979 Forwards Table Re Analysis of Earthquake Intensity at Site. Two of Three Equations Used for Attenuation Contained Errors Resulting in Overestimation of Average OBE Recurrence Intervals ML19270H4701979-08-15015 August 1979 Submits Responses to Requests for Addl Info Re Review of PSAR ML19253A3191979-08-14014 August 1979 Forwards Addl Info Re Environ Rept in Response to 790710 Request ML19269E3941979-06-20020 June 1979 Forwards Response to NRC 790314 & 790419 Requests for Addl Info Re Alternative Site Studies ML19246A9931979-06-20020 June 1979 Forwards Addl Info Re Environ Rept,In Response to NRC 790515 Request ML19269E7561979-06-12012 June 1979 Forwards FP Libertowicz 790625 Affidavit of Svc Affirming Distribution of PSAR Amend 18 & PSAR Site Addendum Amend 23 ML19268B7851979-06-0505 June 1979 Forwards Paper 24, Toward Universal Climatological Extreme Wind Distribution, by Hc Thom.Paper Was Requested in J Goll 790524 Telcon Re Response to NRC Question 372.6(2.3.1) ML19273B7311979-05-31031 May 1979 Forwards Amend 23 to Psar,For Insertion Into Site Addendum ML19270G5171979-05-31031 May 1979 Forwards Amend 18 to PSAR ML19270F8171979-03-23023 March 1979 Reviews Amend 12 to Er Covering Const Effects on Terrain, Vegetation & Wildlife,Intake Sys & Const of Transmission Lines ML19296A4291979-03-12012 March 1979 Forwards Response to 790216 Request for Addl Info Re Preliminary Physical Security Plan.Requests Withholding Plan (Ref 10CFR2.790) ML19283B7551979-03-0707 March 1979 Ack Receipt of NRC 790226 Ltr Forwarding Addl Requests for Info Re PSAR & Site Addendum.W/Exception of Items 130.27, 130.29 & 130.31,will Provide Responses to Requests by 790402 ML19263C7511979-02-24024 February 1979 Ack Receipt of NRC 790216 Ltr Requesting Addl Info Re Preliminary Physical Security Plan.Will Not Be Able to Respond by 790302,but Will Make Every Effort to Respond by 790316 ML19263C4891979-02-20020 February 1979 Responds to 790206 Ltr Requesting Addl Info for PSAR Review 790402.Five of 52 Requests May Not Be Available by 790402 ML19263C3981979-02-15015 February 1979 Forwards Annual Certified Financial Statements for 1978 & Certified Cash Flow Projection for 1979 W/Narrative Statement ML19269D0961979-02-14014 February 1979 Forwards Affidavit Affirming That Amend 17 to PSAR & Amend 20 to PSAR Site Addendum Have Been Served on Persons Designated on Encl List ML20002A0871979-01-30030 January 1979 Forwards Mass & Energy Release Rate Tables for Main Steam Line Break.Tables Are Part of Amend 17 to Psar,Only Table Headings Will Be Printed.Encl Withheld (Ref 10CFR2.790) ML19261B3121979-01-18018 January 1979 Forwards Amend 20 to Site Addendum to PSAR ML19270F5081979-01-18018 January 1979 Forwards Amend 17 to PSAR ML20002A0901979-01-11011 January 1979 Requests Encl Mass & Energy Release Rate Tables for Main Steam Line Break Be Withheld (Ref 10CFR2.790) ML19267A2811978-12-26026 December 1978 Submits Affidavit of FP Libertowicz Affirming That Amend 12 to Environ Rept Was Served to Svc List ML19296A4611978-12-19019 December 1978 Forwards Preliminary Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML19276E5111978-12-15015 December 1978 Requests Response to Attached Constituent 781130 Ltr Expressing Concern About Possible Onsite Storage Capacity for Nuclear Wastes at Facility ML20062F2851978-12-0808 December 1978 Responds to 781024 Request Addl Info Re Subj Site.W/O Encl ML20062E6201978-12-0707 December 1978 Forwards Joint Applicants' Response to Pub Svc Comm of Wi Questions & Requests Clairification Re Environ Rept, Dtd Nov 1978 ML20148A1541978-12-0606 December 1978 Forwards for NRC Consideration & Response a from R Russart Re Amend 15 ML20062G2171978-12-0606 December 1978 Forwards Amend 12 to Environ Rept-Constr Permit Stage ML20062G5001978-12-0505 December 1978 Forwards Applicant'S Statement of Position W/Respect to Unstipulated Contentions of Safe Haven.Applicant Believes Statement Is Inadmissible in This Proc ML20062D7601978-11-24024 November 1978 Ack Receipt of 781108 NRC Ltr Forwarding 2 Requests for Addl Info.Plans to File Amends to PSAR & Site Addendum for Facil & Responses to Requests for Addl Info Contained in Ltr Will Be Incl W/Amend ML20062F9851978-11-17017 November 1978 Requests Addition of D Beckwith as co-counsel to Svc List in Subj Proc. Cert of Svc Encl ML20062D6451978-11-16016 November 1978 Forwards Affidavit of W Dillon of Stone & Webster Engineering Corp Affirming That Copies of Amend 16 to PSAR & Amend 19 to the PSAR-Site Addendum for Subj Facil Have Been Served on Persons Designated on Encl Svc List ML20150C1491978-10-30030 October 1978 Forwards Amend 16 to PSAR & Gen Info Section ML20005A1631976-03-0808 March 1976 Protests Size of Util Financial Commitment in Absence of Any Indication by NRC That Wood & Haven Sites Have Some Future Potential.Early Site Review Should Not Require Detailed Environ Studies ML20005A1591975-08-15015 August 1975 Discusses Selection Process Involved in Alternative & Future Sites,Culminating in Selection of Koshkonong Sites.Site Addendum & Environ Rept Will Be Sent Shortly 1983-04-15
[Table view] Category:UTILITY TO NRC
MONTHYEAR05000302/LER-1983-015, Forwards LER 83-015/03L-01983-04-15015 April 1983 Forwards LER 83-015/03L-0 ML19330C7561980-08-0404 August 1980 Reapprises NRC of Withdrawal of CP Application for Facilities ML19330B4501980-07-28028 July 1980 Requests Return of 781220 Preliminary Physical Security Plan,Per 800517 Withdrawal of Application to Construct & Operate Facility ML19323E4201980-05-17017 May 1980 Informs That Joint Applicants Withdraw Application Before NRC to Construct & Operate Nuclear Plant Per Encl Civil Findings of Fact & Order ML19296B3461980-02-15015 February 1980 Provides Guarantee Under Retrospective Premium Sys.Forwards Documents Demonstrating Adequate Cash Flow.Excerpts from 1979 Annual Certified Financial Statements & 1980 Certified Cash Flow Projection Encl ML19260C7151979-12-28028 December 1979 Discusses Monthly Rept of Expenditures & Commitments. Requests That Repts Be Submitted Quarterly ML19249D9131979-09-17017 September 1979 Discusses Discrepancies in Velocities Used to Calculate Depths of Top Rock & Subrock Reflectors in PSAR Site Addendum Geophysical Rept.Site Addendum Will Be Amended to Incorporate Revised Maps.Certificate of Svc Encl ML19262A1391979-09-17017 September 1979 Discusses Velocity Discrepancies of Fairfied Industries,Inc & Rj Wold Calculations of Depths of Rocktop & Subrock Reflectors in Eastern Lake Mi Faulting Studies.Changes Should Not Affect Basic Conclusions of Psar.Svc List Encl ML19207C3721979-08-31031 August 1979 Forwards Table Re Analysis of Earthquake Intensity at Site. Two of Three Equations Used for Attenuation Contained Errors Resulting in Overestimation of Average OBE Recurrence Intervals ML19270H4701979-08-15015 August 1979 Submits Responses to Requests for Addl Info Re Review of PSAR ML19253A3191979-08-14014 August 1979 Forwards Addl Info Re Environ Rept in Response to 790710 Request ML19246A9931979-06-20020 June 1979 Forwards Addl Info Re Environ Rept,In Response to NRC 790515 Request ML19269E3941979-06-20020 June 1979 Forwards Response to NRC 790314 & 790419 Requests for Addl Info Re Alternative Site Studies ML19269E7561979-06-12012 June 1979 Forwards FP Libertowicz 790625 Affidavit of Svc Affirming Distribution of PSAR Amend 18 & PSAR Site Addendum Amend 23 ML19268B7851979-06-0505 June 1979 Forwards Paper 24, Toward Universal Climatological Extreme Wind Distribution, by Hc Thom.Paper Was Requested in J Goll 790524 Telcon Re Response to NRC Question 372.6(2.3.1) ML19273B7311979-05-31031 May 1979 Forwards Amend 23 to Psar,For Insertion Into Site Addendum ML19270G5171979-05-31031 May 1979 Forwards Amend 18 to PSAR ML19296A4291979-03-12012 March 1979 Forwards Response to 790216 Request for Addl Info Re Preliminary Physical Security Plan.Requests Withholding Plan (Ref 10CFR2.790) ML19283B7551979-03-0707 March 1979 Ack Receipt of NRC 790226 Ltr Forwarding Addl Requests for Info Re PSAR & Site Addendum.W/Exception of Items 130.27, 130.29 & 130.31,will Provide Responses to Requests by 790402 ML19263C7511979-02-24024 February 1979 Ack Receipt of NRC 790216 Ltr Requesting Addl Info Re Preliminary Physical Security Plan.Will Not Be Able to Respond by 790302,but Will Make Every Effort to Respond by 790316 ML19263C4891979-02-20020 February 1979 Responds to 790206 Ltr Requesting Addl Info for PSAR Review 790402.Five of 52 Requests May Not Be Available by 790402 ML19263C3981979-02-15015 February 1979 Forwards Annual Certified Financial Statements for 1978 & Certified Cash Flow Projection for 1979 W/Narrative Statement ML19269D0961979-02-14014 February 1979 Forwards Affidavit Affirming That Amend 17 to PSAR & Amend 20 to PSAR Site Addendum Have Been Served on Persons Designated on Encl List ML20002A0871979-01-30030 January 1979 Forwards Mass & Energy Release Rate Tables for Main Steam Line Break.Tables Are Part of Amend 17 to Psar,Only Table Headings Will Be Printed.Encl Withheld (Ref 10CFR2.790) ML19261B3121979-01-18018 January 1979 Forwards Amend 20 to Site Addendum to PSAR ML19270F5081979-01-18018 January 1979 Forwards Amend 17 to PSAR ML19267A2811978-12-26026 December 1978 Submits Affidavit of FP Libertowicz Affirming That Amend 12 to Environ Rept Was Served to Svc List ML19296A4611978-12-19019 December 1978 Forwards Preliminary Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML20062F2851978-12-0808 December 1978 Responds to 781024 Request Addl Info Re Subj Site.W/O Encl ML20062E6201978-12-0707 December 1978 Forwards Joint Applicants' Response to Pub Svc Comm of Wi Questions & Requests Clairification Re Environ Rept, Dtd Nov 1978 ML20062G2171978-12-0606 December 1978 Forwards Amend 12 to Environ Rept-Constr Permit Stage ML20062D7601978-11-24024 November 1978 Ack Receipt of 781108 NRC Ltr Forwarding 2 Requests for Addl Info.Plans to File Amends to PSAR & Site Addendum for Facil & Responses to Requests for Addl Info Contained in Ltr Will Be Incl W/Amend ML20062D6451978-11-16016 November 1978 Forwards Affidavit of W Dillon of Stone & Webster Engineering Corp Affirming That Copies of Amend 16 to PSAR & Amend 19 to the PSAR-Site Addendum for Subj Facil Have Been Served on Persons Designated on Encl Svc List ML20150C1491978-10-30030 October 1978 Forwards Amend 16 to PSAR & Gen Info Section ML20005A1631976-03-0808 March 1976 Protests Size of Util Financial Commitment in Absence of Any Indication by NRC That Wood & Haven Sites Have Some Future Potential.Early Site Review Should Not Require Detailed Environ Studies ML20005A1591975-08-15015 August 1975 Discusses Selection Process Involved in Alternative & Future Sites,Culminating in Selection of Koshkonong Sites.Site Addendum & Environ Rept Will Be Sent Shortly 1983-04-15
[Table view] |
Text
.
O Wisconsin Electnc POWER COMPANY 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 August 31, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555
Dear Mr. Denton:
DOCKET NO. STN 50-502 HAVEN NUCLEAR PLANT SEISMIC RISK EVALUATION Appendix 2K of the Haven Site Addendum provides results of seismic risk calculations which are used to estimate the average recurrence interval of the Operating Basis Earthquake (OBE) at the Haven site. These calculations were performed using various attenuation laws described in Appendix 2K.
During review of these calculations, we have determined that two of the three equations used for attenuation contained errors which resulted in overestimation of average OBE recurrence intervals at the Haven site.
In addition to these errors, refinments in seismic risk calculations have been developed since the original analysis was performed. The calculations have been redone using revised equations representing the present state-of-the-art and a method suggested by the NRC Staff. The reanalysis indicates an average recurrence interval of 419 years conpared to the original value of 1595 years. The recurrence interval of 419 years, while lower than the original estimate, confinns that the OBE acceleration value chosen for the Haven site is conservative and there is no need to change plant design.
The results of the seismic risk calculations are enclosed as Table 1. This table will be incorporated in Appendix 2K of the Haven Site Addendum at an appropriate time.
Very truly yours,
/
- Sol Burstein Exe utive Vice President Enclosure 0\
t
') \ }
Copy to Service List s I --
7009110
i UtilTED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l Before the Atomic Safety and Licensing Board l In the Matter of i WISCONSIll ELECTRIC POWER Docket flo. STil 50-502 COMPN 1Y, ET AL. ,
I Haven fluclear Plant I
SERVICE LIST Chairman Robert H. Gorrke, Esq.
Atomic Safety and Licensing Board Wisconsin Electric Power Company U. S. !{uclear Regulatory Comission 231 West Michigan Street Washington, D. C. 20555 Milwaukee, Wisconsin 53201 Mr. Glenn 0. Bright Mr. Sol Burstein Atomic Safety and Licensing Board Executive Vice President U. S. Nuclear Regulatory Comission Wisconsin Electric Power Company Washington, D. C. 20555 231 West Michigan Street Milwaukee, Wisconsin 53201 Dr. E. Leonard Cheatum Route #3 Mr. William Charles Hanley Box 350-A President Watkinsville, Georgia 30677 Safe Haven Ltd.
P. O. Box 40 Steven C. Goldberg, Esq. Kohler, Wisconsin 53044 Office of the Executive Legal Director David E. Beckwith, Esq.
U. S. Nuclear Regulatory Comission Foley & Lardner Washington, D. C. 20555 First Wisconsin Center 777 E. Wisconsin Avenue Docketing and Service Section Milwaukee, Wisconsin 53202 Office of the Secretary U. S. Nuclear Regulatory Commission Mr. Richard W. Henneger Washington, D. C. 20555 Bureau of Legal Services Department of Natural Resources Thomas A. Lockyear, Esq. Box 7921 Assistant Chief Counsel Madison, Wisconsin 53707 Public Service Commission of Wisconsin Hill Farms State Office Building Madison, Wisconsin 53702 Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D. C. 20036
- c. r
, e u;
l . . .
l TABLE 1
. ANALYSIS OF EARTHQUAKE INTENSITY AT SITE _ _ __ _ .._ _ _ _
~
Annual Risk at the Site of Exceeding Intonsity Attenuation Rato Rono Law # 10 b (km) _
VI VII VIII Brazee 0.001 4 7.0 0.845 40 6.75 x 10-4 0.0 0.0 0.001 4 7.5 0.845 40 1.18 x 10 -3 7.10 x 10-5 0.0 0.001 4 8.0 0.845 40 1.77 x 10-3 2.09 x 10
- 0.0 0.001 6 7.0 0.247 40 2,78 x 10-3 0.0 0.0 0.001 6 7.5 0.247 40 4.11 x 10-3 2.47 x 10
-4 0.0 0.001 6 8.0 0.247 40 5.67 x 10-3 6.70 x 10-4 0.0 Gupta & 7.0 5.78 x 10 -4 6.78 x 10 -5 -6 0.536 4 0.845 23 163 x 10 Huttli 0.536 7.5 -4 1.22 x 10 *
-# -0 4 0.845 . 23 7.81 x 10 7.74 x 10
-3 -#
0.536 4 8.0 0.845 . 23 1.03 x 10 1.79 x 10
- 2.10 x 10-5 0.536 6 7.0 0.247 23 2.39 x 10-3 2.80 x 10-#* 6.73 x 10
-6 0.536 6 7.5 0.247 23 2.72 x 10 -3 4.25 x 10-4 2.70 x 10 -5 0.536 6 8.0 0.247 23 3.29 x 10-3 5.74 x 10-4 6.73 x 10-5 Howell & 0.64 7.0 0.845 25.5 8.38 x 10
-6 4 4.63 x 10 1.16 x 10-3 1.72 x 10 -4 Schultz 0.64 4 7.5 0.845 25.5 1.41 x 10-5 0 64 4 8.0 0.845 25.5 1.53 x 10-3 2.60 x 10-#* 3.09 x 10-5 0.64 -6 7.0 0.247 25.5 3.46 x 10-3 4.12 x 10-4 1.91 x 10 -5 4.05 x 10 -3 0.64 6 7.5 0.247 25.5 5.98 x 10
-3 a
.k 0.64 6 8.0 0.247 25.5 4.91 x 10 8.33 x 10 -4 9.91 x 10 -5 Risk Per Year Aveiage 2.38 x 10-3 2.90 x 10-#* 1.94 x 10-5 Maximum 5.67 x 10-3 8.33 x 10-4 9.91 x 10-5 Mininum 5.78 x 10-4 0.0 0.0 Return Period (Years)
Average 419 3448 51,546 Maximum 1730 - -
Minimum 176 1200 10,091 Sheet'l of 2
\
s TABLE 1 (cont'd)
ANALYSIS OF EA}tTifQUAKE INTENSITY AT SITE Attenuation Laws Brazee I = 3.387 + I. - 0.894 Inn - 0.00289R Gt.pta & I = 3.7 + I, - 1.173 inR - 0.00lIR Nuttli llowell & I = 3.278 + I, - 0.989 InR - 0.0029R Shultz Definitions P is standard deviation I g, is lower bound intensity of source area I S is upper bound intensity of sourco area
_g Hate is annual rate of occurence of earthquake ? I o -
[.[ Rone is radius from epicenter for which there is no attenuation w
Sheet 2 of 2 .