ML19207C250

From kanterella
Jump to navigation Jump to search
Supplements 790713 Response to NRC 790625 Transmittal of IE Bulletin 79-13.Plant Shutdown Will Commence 790929 to Examine Feedwater nozzle-to-piping Welds
ML19207C250
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/03/1979
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7909100553
Download: ML19207C250 (1)


Text

Tfc o

CONNECTICUT YANKEE AT O M I C POWER COMPANY I

l DERLIN. CONNECTICUT

/

P O HOX 270 H A R T F O R D. C O N N E C T IC U T 0 6101 w

T e s e em>me 2 0 3 6 6 6 e 911 August 3, 1979 Docket No. 50-213 Mr. Boyce 11. Crier, Director Region I Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of. russia, PA 19406

References:

(1)

B.11. Grier letter to W. G. Counsil dated June 25, 1979, transmitting I&E Bulletin //79-13.

(2)

W. G. Counsil letter to B. II. Grier da ted July 13, 1979.

Centlemen:

lladdam Neck Plant Feedwater System Piping In Reference (1), the NRC Staff requested a schedule for the examination of f eedwater nozzle-to-piping welds at the Haddam Neck Plant.

In Reference (2),

Connecticut Yankee Atomic Power Company (CYAPCO) responded to this request with a schedule calling for a shutdown not later than October 30, 1979, approximately five weeks later than the Reference (1) request.

Since that time, CYAPC0 has refined and optimized the schedule for this and other efforts requiring a plant shutdown, as well as advancing the assessment of reserve system generating capacity deccribed in Item (2) of Reference (2).

The revised schedule calls for a plant shutdown to commence on September 29, 1979. This schedule was discussed earlier today by telephone with a member of the I6E Staff; as a result of that d iscu s sion, it is CYAPC0's understanding that you ffnd this schedule acceptable.

The purpose of this letter is to formally document that understanding.

In the abronce of additional cormunication on this subject, the scheduled shutdown to respond to Reference (1) will begin on or before September 29, 1979.

Very truly yours, COL:;ECT iCUT YANKEE ATOMIC POWER COMPANY

/[ ((/[f}-

W. G. Counsil Vice President bd, u.s.i 3 7009100 WJ