'7%c e
Cw CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN. CONNECTICUT P O BOX 270 HARTFORD CONN ECTICUT 06101 Ts t s ewo% s 203 666 6911 August 1, 1979 Docket No. 50-21_3 Mr. Boyce H. Grier, Director Region 1 Of fice of Inspection and Enforcement U.
S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
References:
(1)
B. H. Grier letter to W. G. Counsil dated July 18, 1979, transmitting I&E Bulletin #79-14, Revision 1.
(2)
B. H. Grier letter to W. G. Counsil dated July 2,1979, transmitting I&E Bulletin #79-14.
Gentlemen:
Haddam Neck Plant Seismic Analyses, I&E Bulletin #79-14 Reference (2), as amended by Ref erence (1), requested Connecticut Yankee Atomic Power Company (CYAPCO) to initiate a program aimed at verifying the accuracy of input information for seismic analyses of safety-related piping.
Subsequent to the receipt of this bulletin, communications with the NRC Staf f have resulted in a more concise understanding of the intent of the bulletin requirements.
As such, CYAPCO has embarked upon a program consistent with our present under-standing, with the following exception:
Insulation around some valves and embedments is extremely difficult and time-consuming to remove and replace.
CYAPCO, therefore, intends to verify geometry and function at locations where removal of insulation would either result in unnececsary personnel exposure or be unduly cumbersome using alternate techniques.
These would include a sampling of components where insulation is most readily removed and a partial inspection of the remaining locations using probes and/or cutting away small portions of insulation.
Favorable results using these alternative techniques yields high confidence from a statistical basis that the existing seismic analyses are valid.
In response to the requirements of Item (1) of Reference (1) and based on subsequent conversations with the NRC Staff, the following information is included as Attachment 1.
(1) A list of the safety-related systems to be examined including their inspection schedule (i.e., 60 days or 120 days).
..y f};){,;*J/2 7 9 0910 o/y' g 4
(2) A list of the design drawings to be used for verification of the accuracy of input information used for seismic analysis of safety-related piping including:
(a) Boundary Diagrams.
(b) Physical piping drawings.
(c) Piping Flexibility and Seismic Analysis Summary Sheets.
(d) Piping Stress Analysis Report.
Other information to be used in the inspection is contained on hanger drawings, valve drawings, and penetration drawings.
Hanger drawings will be used to determine accuracy of support locations and function.
The valve drawings will be used to verify valve weights. The penetration drawings will be used to verif y penetration function.
These documents have not been specifically identified herein, but are available at the Haddam Neck Plant site for your review.
We trust you find the above information responsive to your request.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY j
[fq[$
W. G. Counsil Vice President At tachment 0$ fly 0
DuCKET NO. 50-213 ATTACle!ENT HADDAM NECK PLANT SEISMIC ANALYSES, I&E BULLETIN #79-14 AUGUST, 1979 O s3 I ) O [ O
IE BULLETIN 79-14 Boundary Non Accessible Systems Diagram No.
Redundant Redundant Yes No' Some Comments 2
Main Steam 16103-26045 NA X
Accessible outside containment for visual Page 1 inspection only Feedwater/
16103-26045 See X
Redundant pumps with nonredundant piping Aux Feedwater Page 2 Comments accessible outside containment Reactor Coolant 16103-26045 x
X Sheet 4 RHR System 16103-25045 See X
Redundant pumps and HX's with nonredundant Page 5 Comments piping ECCS HPSI Charging 16103-26045 See X
Redundant pumps wi th nonredundant piping Sheet 6 Comments ECCS LPSI-RHR 16103-26045 See X
Redundant pumps with nonredundant piping Sheet 6A Comments Spent Fuel Pool 16103-26045 X
X Cooling System Page 8 Service Water 16103-26045 X
X Accessible except in containment System Page 9 Chemical and 16103-26045 See X
Redundant pumps with nonredundant piping Volume Control Sys Sheet 10 Comments Diesel Generator CY-DF0-1 X
X Fuel Oil System C@ Diesel Generator CY-DSA-1 X
X f!i Starting Air Sys
)&
w C..r j
1 60-Day inspection 2
120-Day inspection
TABLE 1 DESIGN DOCUMENTS USED AS INPUT INFORMATION FOR SEISMIC ANALYSES l
j DESCRIPTION OF TITLE OF DOCUMENT IDENTIFICATION #
i REVISION I
DATE l
SEISMIC INPUI INFORMATION I
i ISI Boundary Diag. Main Steam l
Definition of Seismic Cat. I 1
5/9/77 ;
Portions of Systems System 16103-26045; Pg. 1 1
ISI Boundary Diag. Feedwater/
16103-2604 5 ; Pg. 2 2
5/9/77 !
Definition of Seismic Cat. I l
Portions of Systems Aux. Feed ISI Boundary Diag. Reactor 16103-26045; Pg. 4 1
, 5/9/77.
Definition of Seismic Cat. I Coolant l
Portions of Systems ISI Boundary Diag. Residual 16103-26045; Pg. 5 l
2 5/9/77 '
Definition of Seismic Cat. I Ileat Removal
^
Portions of Systems i
16103-26045 ; Pg. 6 0
5/22/79 ;
Definition of Seismic Cat. I 11 PSI, Charging l
Portions of Systems ISI Boundary Diag. ECCS -
16103-26045; Pg. 6A 0
5/22/79 Definition of Seismic Cat. I I
LPSI, RIIR Portiens of Systems I
ISI Boundary Diag. Spent
! 16103-26045; Pg.
8 2
5/9/77 Definition of Seismic Cat. I Fuel Pool Cooling
~
l Portions of Systems I
i.
ISI Boundary Diag.
16103-26045 ; Pg. 9 2
5/9/77.
Definition of Seismic Cat. I I
Service H2O Portions of Systems ISI Boundary Diag. Chem.
16103-26045; Pg. 10 2
5/23/78 Definition of Seismic Cat. I and Vol. Control Portions of Systems ISI Boundary Diag. Chem.
16103-26045 ; Pg.10A 0
5/30/79 Definition of Seismic Cat. I and Vol. Control Portions of Systems (4
CC Ty
Table I (Continued)
Page 2 DESCRIPTION OF TITLE OF DOCUME!.'T IDENTIFICATION #
REVISION DATE SEISMIC INPUT INFORMATION l
Boundary Diagram Dies. Gen.
CY-DSA-1 O
5/9/71
! Definition of Seismic Cat. I Starting Air l
Portions of Systems l
Boundary Diagram Dies. Gen.
CY-DFO-1 0
l 5/9/77 l Definition of Seismic Cat. I Portions of Systems Fuel Oil i
Main Steam System Piping 16103-20001 thrtugh Varies bries l
Physical Piping Drawings.
Drawings 20004 S.G. Feedwater System 16103-23001 Varies Varies I
Physical Piping Drawings.
Piping Drawings Shts. 1-4 i
j Physical Piping Drawings.
Aux. Stm. Gen. Feed Pump 16103-26031 Varies Varies i
Piping Shts.1 and 2 l
f i
Varias Varies Physical Piping Drawings.
Spent Fuel Pit Piping 16103-20059 I
Shts. 1 - 3 Reactor Coolant Piping 16103 - 20079 Varies Varies Physical Piping Drawings.
Drawings Shts. 1 and 2 l
Service Water System 16103-20124 Varies Varies Physical Piping Drawings.
Piping Shts. 1 - 6 Piping Arrangements -
16103-20148 Varies Varies Physical Piping Drawings.
Fuel, Water, Air for Shts. 1 and 2 Diesel Generator Miscellaneous Reactor 16103-20007 Varies Varies Physical Piping Drawings.
Containment Piping Shts. 1 - 19 C
Q, Miscellaneous Primary l 16103-20034 Varies Varies Physical Piping Drawings.
O Auxiliary Building Piping Shts. 2 - 22 C
i eD
Table 1 (Continued)
Page 3 DESCRIPTION OF TITLE OF DOCUMENT IDENTIFICATION REVISION DATE I
SEISMIC INPUT INFORMATION Miscellaneous Yard and 15103-20072 Varies Varies Physical Piping Drawings.
Tankage Area Piping Shts. 1 and 2 16103-20074 l
Shts.1 - 3 i
16103-20077 Main Steam System Outside 16103-95052 Varies Varies Stress Analysis Isometric and Containment Shts. 1-4 Reference to Physical Piping 16103-95137 Drawing (s) through 16103-95146 Main Steam System Inside
'.6103-95053 Varies Varies Stress Analysis Isometric and Containment 16103-95071 Reference to Physical Piping Shts. 1-3 Drawings Residual lleat Removal 16103-95104 Varies Varies Stress Analysis Isometric and System Piping Shts. 1 and 2 Reference to Physical Piping Flexibility Analysis 16103-95106 Drawings Summary Shts. 1 - 12 I
l Pressurizer Relief 16103-95118 i
Varies Varies Stress Analysis Isometric and Line Piping Analysis 16103-95119 Reference to Physical Piping l Drawings 16103-95120 Summary l
Shts. 2-6 l
g
}
l Report -- Support of J.O. No. 12456. 05 0
9/19/75 Stress Analysis Isometric and Feedwater Piping Inside l Reference to Physical Piping Containment l
1 l Drawings i
l A
C' C3 O
GC CJ
TABLE I DESIGN DOCUMENTS USED AS INPUT INFORMATION FOR SEISMIC ANALYSIS l
DESCRIPTION OF
~
TITLE OF DOCUMENT IDENTIFICATION //
REVISION DATE SEISMIC INPUT INFORMATION Specification for Nuclear CYS-1550 N/A 7/21/65 Pipo sizes and properties.
Piping General hanger requirements.
t
'd CJ CO 2h