ML19207B976

From kanterella
Jump to navigation Jump to search
Forwards LER 79-029/03L-0
Date released: 08/09/2019 Download: ML19207B976


LER 79-029/03L-0:on 790803,during Turbine Roll,Containment Particulate & Gaseous Monitor Was Rendered Inoperable.Caused by Blown Neutral Phase Fuse in Fuse Holder.Holder Was Jumpered & Control Power Restored.Replacement Is on Order
ML19207B978
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/31/1979
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19207B978 (2)
Forwards LER 79-029/03L-0
ML19207B975
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/31/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19207B975 (1)