IE Bulletin 78-03, Potential Explosive Gas Mixture Accumulations Associated W/Bwr Offgas Sys Operations
ML19207B762
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/08/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
IEB-78-03, IEB-78-3, NUDOCS 7909050232
Download: ML19207B762 (4)


Text

-J 1

U

b E

UNITED STATES e

m NUCLEAR REGULATORY C0:stISSION E

OFFICE OF INSPECTION AND ENFORCEMENT F

M.,

WASHINGTON, D.C.

20555 h

N3

'?

February 8, 1978 u

E V

a Ju IE Bulletin No. 78-03 6

"]

POTENTIAL EXPLOSIVE GAS MIXTURE ACCUMULATIONS ASSOCIATED WITH BWR OFFGAS 5

SYSTEM OPERATIONS 1

f r

Description of Circumstances:

(i On December 13, 1977, two hydrogen explosions occurred at the Millstone Nuclear Power Station Unit No. 1, a boiling water reactor (BWR).

f L

The first explosion occurred at 9:30 a.m. and was mostly confined to the V

offgas system.

Damage was relatively minor, including the breaking of D

glass faces on offgas system flow differential pressure gages, the I

blowout of a rupture disk and the evacuation of loop seals between the B

offgas system drain lines and stack base sump.

g O'

The second explosion occurred at 1:00 p.m. outside the offgas system in h

the two-level room at the base of the plant stack.

This explosion blew f

the stack base space door into a warehouse about 200 feet away, breached the reinforced concrete ceiling between the stack chimney and the stack 3

y base space, extensively damaged the ceiling beams, dislodged the 2-ton

4

- J concrete plugs in the floor above the offgas system particulate filters, I.

damaged the stack radiation monitor isokinetic probe supports, and j

.J produced cracks in the stack.

These cracks were vertical, with a PJ maximum separation at the surface of 1/16 inch; however, the overall structural capability of the stack was not impaired.

j a

One man was injured by the blast, receiving a concussion, skin abrasions, 1

and contamination.

He was hospitalized because of the concussion and was released four days after the event.

g ajj The licensee's review of the event concluded that the action taken to i

restore offgas system drain line loop seals in the stack base space had not been successful. Without these seals, gases from the offgas l,

system accumulated in the space, resulting in an explosive mixture

)

which was probably ignited by a spark from the level switch in the stack base sump.

Inadequate ventilation of the stack base space and i

ii the lack of equipment installed to monitor explosive gas concentrations j

~

within the enclosed area were concluded to be contributing factors.

j 4

2, 1 of 3 v

V. !

20 f

g.

I S O9 0 5.0 M'cd _.. _

__. d u

Ukbh

!h f

f

- -mw==m ------

< - _,t D

.:m1

<l

.1%

2Oa IE Bulletin No. 78-03 February 8, 1978 2:;d WL

+-E By way of background, it is recognized that accumulation of explosive g

hydrogen mixtures was considered in the design of the BWR offgas systen.

Q As a result, the design has prevented major releases of airborne radio-p;t; activity in the approximately 25 known hydrogen gas explosions that

~5y have occurred within the offgas systems of operating BWRs.

Extensive

Q mechanical damare to equipment and structures, however, in addition to n

uncontrolled relesce of radioactive material, have resulted from five ui..a explosions, including the Millstone event, where hydrogen gas accumulated

-j outside of the offgas system.

1 71 Action to be Taken by Licensees:

r 1

For all BWR power reactor facilities with an operating license:

1.

Review the operations and maintenance procedures related to the'

- a offgas system to assure proper operation in accordance with all O -J design parameters.

Include in this review measures you have taken

?

or will take to prevent inadvertent actions (such as arc strikes) which might cause ignition of the mixture of gases contained in the t

~~

offgas piping.

2.

Review the adequacy of the ventilation of spaces and areas th' rough which offgas system piping containing explosive mixtures of gases pass.

The review should consider ventilation losses JJ and off-normal offgas system operation, such as lack of dilution steam, lost loop seals, blown rupture disks, bypassing recombiners, and leakage of offgas into isolated portions of systems.

-3.

For those spaces and areas. identified, describe what action you have taken or plan to take to assure that explosive mixtures cannot accumulate, that monitoring equipmer:t will warn of such an accumulation, and that disposal of such mixtures will be controlled without resulting in a damaging explosion.

4.

Loop seals are potential offgas leakage paths following a pressure transient in the offgas system piping. Describe your design features to minimize and detect the loss of liquid from loop seals and describe operating procedures wh4ch assure prompt detection and re-seal of the blown loop seals.

h 5.

Review operating and emergency procedures to assure that your operating staff has adequate guidance to respond properly to

,g offgas system explosions.

n y

.'[ 1

-r 2 of 3 Q]

9 C

[ *,,

=

f v

  • g
  • [

p 1

1

+p?,sTE.n.Qm6%>%s? &wl2 4 9,

,e g

"fj9& mag.p.m.x. _Q y_ m. % iy;>

.-1. h :577sy,2 _

" Qf i m,.

g. s. m nm.m

~ - agl.llhhsj%s O..s 1{Q, '.s&i&..p&D18$cfy*

&$4ihW$-(Q

. j h

, - -. 3 ez.gj IE Bulletin No. 78-03 February 8, 1978

.w 66d

%n,

6.

Within 45 calendar days of the date of issue of this bulletin, M..

report in writing to the Director of the appropriate NRC Regional 3.'

C']

- ;^

Office, the results of your review and your plan of action with regard to Items 1 through 5.

A copy of your report should be 72 7 sent to the United States Nuclear Regulatory Comission, Office W

of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D. C. 20555.

<,, +

.'l i For all BWR power reactor facilities with a construction permit, this Bulletin is for information cnly and no written response is required.

Approved by GAO, B180225 (R0072); clearance expires 7/31/80.

Approval was given under a blanket clearance specifically for identified generic problems.

i e

a j

e 0

b4 5, 4 -

n i.2.-

- - 1

.,,.*^

1 pp, 31 b

e #

_j

~

l 1

1

,.4.

ny J i

3 of 3 s

.Q;,

w

~ r.,

6 'a i

I I

e4 o-q

.-. v 4

1hl'q

]

J u~? g N ne % * ' _ N&

W*_ k & "g 4

T"f a

g. f V sp.

<f l

9, k

h fa f

.,e e,.r.-n[ -$

'[$ h

  • N^

a.~ki:ww,b.w.J,n*tn M.- c % % g i g i d,.j,d g d j g,4.;, M g g.;; g m.n h N h m.' n'f b Ivgb,6 N

'[

[i. h. *h" 4kO

-1 4,,-

[ '

n.w

.~

f

,, s.

2 otn

---~ j

=:-

,.. a a-4'm id Nf s

IE Bulletin fio. 78-03

-~Q February 8, 1978 m.-

iM LISTIrlG OF IE BULLETINS E

ISSUED IN 1978

c. n 8 c-2

' 'I*2M

=*3 Bulletin Subject Date Issued Issued To em ud 354 No.

ic~,

TQj 78-01 Flamable Contact -

1/10/78 All Power Re ctor "in Arm Retainers in G.E.

Facilities w th an

"?"

CR120A Relays Operating License N

(0L) or Construc-tion Permit (CP) 1 78-02 Terminal Block 1/30/78 All Power Reactor Qualification Facilities with an l

Operating License (OL) or Construc-Permit (CP)

)O

,c y W

6

^

-f o

4 sr.,

c

, c.

.4

a h;' l i

a i

  • }.

.w!

Is..

=:.

',Ea g

-s.

c, I

I l

so -

i

,T.1,

)

- i'

- -l Page 1 of 1 f

f i

=m.

w eeuw n n,: nk?gsun1 *.n n f

E

.- waam*?ag',s,,m..

sI,?_

i s

__.n x,e e:. caw.~ w n u ruenw.

.-a~ me-,na. wm z _.

..