MISSISSIPPI POWER & LIGHT COMPANY ka Helping B uild Mississippi
~~
P. O. B O X 16 4 0. J A C K S O N. MI S SIS SIP PI 39205 P A O,0 U C T 4 O N DCPamTMENT
~
Office of Inspection and Enforcement August 14, 1979 U. S. Nuclear Regulatory Coc: mission Region II 101 Marietta Street, N. W. - Suite 3100 Atlanta, Georgia 30303 ATTENTION: Mr. J. P. O'Reilly, Director Centlemen:
SUBJECT:
Grand Gulf Nuclear Station File: 0272/0498/15525 Interim Report for Potential Reportable Deficiency No.
79/11 As Defined in 10 CFR 50.55(c)
AECM-79/87 On July 9,1979, Mississippi Power & Light Company notifled Mr. J. h.
Rausch of your of fice of a potentially reportable deficiency at the Grand Gulf Nuclear Station construction site.
The deficiency concerns a problem with cracked cent.ol device assemblies on 4.16 KV Switchgear, 6.9 KV Switch-gear and 480 Volt Load Centers, provide.d by Gould-Switchgear Division.
To date, the inspection of breakers associated with 6.9 KV Switchgear, 4.16 KV Switchgear, and 480 Volt Load Centers identified the following quantities of cracked control devices:
Cracked De', ices Type of Ecuipment Un it 1 Unit 2 6.9 KV Switchgear 15 4.16 KV Svitchgear 3e 480 Volt Load Centers 16 9
- No t Inspected The degree of cracking did not appear to correlate with the frequency of operating the devices.
This deficiency is currently under investigation to determine reporta-bility within the conditions of 10 CFR 50.55(e) and corrective action. The decision on reportability will be provided to you no later than Nove.aber 30, 1979.
gog\\
853 332 7908290195
\\
Member Middle South Utilities System
MISSISSIPPI POWER & LIGHT COMPANY Mr. J. P. O' Reilly, Director U. S. Nuclear Regulatory Commission AEC"-79/87 August 14, 1979 Yours truly, Y
L. F. Dale Nuclear Project Manager JRF/pa ec:
Mr. N. L. Stampley bec:
Dr. D. C. Gibbs Mr. R. B. McGehee Mr. Adrian Zaccaria Mr. T. B. Conner Mr. J. N. Ward Mr. D. M. Lake Mr. John G. Davis, Director 4THE COPY F99 Mr. R. L. Scott Division of Inspection & Enforcement Mr. J. P. McGaughy, Jr.
U. S. Nuclear Regulatory Coc=tission Mr. W. L. Nail Washington, D. C.
20555 Mr. T. E. Reaves Mr. C. K. McCoy Mr. P. W. Sly Ms. E. W. Chumley Potential Reportable Deficiency File File 853 333