72 LONG ISLAND LIGHTING COM PANY
/
- 08C@
SHOREHAM NUCLEAR POWER STATION 4.
afawasuf EO. BOX G10, NORTH COUNTRY RO AD e WADING RIVER, N.Y.11792 July 27, 1979 SNRC-409 Mr. Boyce 11. Grier Office of Inspection & Enforcement Region 1 U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l
l Long Island Lighting Company Shoreham Huclear Power Station - Unit 1 Docket No. 50-322 l
l
Dear Mr. Grier:
l I
dRC Inspection & Enforcement Bulletion No. 79-11, dated May 22, 1979, requires that we determine whether Westinghouse Type DB-50 or Type DB-75 circuit breakers with over cucrent trip devices are I
used in safety-related Class IE systems at the Shoreham Nuclear Plant.
The need for this review originated in a Licensee Event Report which noted that during surveillance testing the overcur-rent trip time for these devices had been found to have drifted from the manufacturer's design minimum of 6 seconds to 5.50 and 5.12 seconds.
Subsequent visual inspections revealed hairline I
crachc in the dachpot end caps of the devices, which the manu-facturer later attributed to a raw material batch problem.
I Our survey has determined that Westinghouse Type DB circuit breakers have not been directly purchased for use in safety-related systems at Shoreham, nor have they been employed in any safety-related equipment supplied to us by other manufacturers.
Accordingly, no further action is required by us with regard to this bulletin.
I V
y huly yours,
tW@
l
\\
1 P.
Nov rro
'y b g f//1 i
Project hanager Shoreham Nuclear Power Station GKP : j m cc: