.., _ _ _
l ',.
j UNITED STATES 1
NUCt. EAR REGULATORY COMMISSION j,g(9 ),g WASHINGTON, D. C. 20555 a.,,s e
q
+...
NEBRASXA PUBLIC POWER DISTRIC's DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 58 License No. OPR-46 i.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Nebraska Public Power District (the licensee) dated June 21, 1979, complies with the standards and requirements of the Atomic Enerry Act of 1954, as amended (the Act), and the Commission's rul!s and regu?3tions set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, ano (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in axordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Soecifications as indicated in the' attachment to this license amendment and paragraph 2.C(2) of Facility License No. DPR-46 is hereby smended to read as follows:
848 190 (2) Technical Saecifications The Technical Soecifications contained in Appendices A and B, as revised through Amendment No. 58, are ON,..,, m,,'? NC d hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
989-7908220 g
- . 3.
This license amendment 's effective as of June 22, 1979.
FOR THE NUC AR REGULATORY COMMISSION Thomas A. Ippolfto Chief Operating Reactors Branch #3 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 23, 1979 i
e i
h I
l L'.
i n
[
848 19I B
A
ATTACHMENT TO LICENSE AMENDMENT NO. 58 FACILITY OPERATING LICENSE NO. DPR-46 DOCKET N0. 50-298 Replace the following pages of the Apper. dix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 164 164 G
n0%
Cl 4 Ei 1 9 2
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIRIMENTS 3.7.A (cont'd.)
4.7.A (cont'd.)
d.
If specifications 3.7.A.4.a,b cc Once each operating cycle, each vacuum c.
cannot be met, the situation si....
breaker valve shall be visually in-be corrected within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the spected to insure proper maintenance reactor will be placed in a cold and operation of the position indication shutdown condition within the sub-switch. The differential pressure set-sequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
point shall be verified.
d.
Prior to reactor startup after each 5.
OxyRen Concentration refueling, a leak test of the drywell to suppression chamber structure a.
After complet' of the startup tasc shall be conducted to demonstrate program and demonstration of plant that the requirement of 3.7.A.4.c electrical output, the primary con.
is met.
tainment atmosphere shall be reduced to less than 4% oxygen with nitrogen 5.
Oxygen concentration gas during reactor power operation with reactor coolant pressure above a.
The primary containment oxygen con-100 psig, except as specified in centration shall be measured and 3.7.A.S.b.
recorded at least twice weekly, b.
Within the 24-hour period subsequent to placing the reactor in the Run mode folleving a shutdown, the containment atmosphere oxygen concentration shall be reduced to less than 4 by volume b.
The quantity of liquid nitrogen in and maintained in this condition.
the liquid nitrogen storage tank shall De-inerting may co=mence 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> be determined twice per week when the prior to a shutdown.
volume requirements of 3.7.A.S.c are in effect.
When the containment atuasphere oxygen c.
concentration is required to be less than 4%, the minimum (guantity cf liquid nitrogen in the liquid' nitrogen storage tank shall be 500 gallons.
d.
If the specifications of 3.7.A.S.a thru e cannot be met, an orderly shutdown shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e.
The specifications of 3.7.A.5a thru d are not applicable during a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Ok continuous period between the dates of June 22, 1979 and June 25, 1979. 3. Standby Cas Treatmant System B. Standbv Gas Treatment System 10 1. At least once per operating cycle the 1. Except as specified in 3.7.B.3 below' 'I 10 both circuits of the standby gas treat-ment system and the diesel generators a. Pressure drop across the combined, HEPA filters and charcoal adsorber banks is Amendment No. 68 -164 - F./! e.: 6}}