MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
t e .
OPEllAllNG DATA 1;l:1 Ol;T .
DOC:'IT t.'O. _50 293 DA1E 0/-[79._
9 COMPl.EJ ED !sY C.M.Caffney TEl.11 IlONr 617-746-7900 O!'l RYl!NG C.T i'll3 P il grit,. 1 Notes
- 1. Unit tu, me-
- 2. Repoi:iig Pt riint- J"IV, l979 _
3.1.icensed l lw ux.! Pm.tr (MWt )- I998*
- 1. Namept u e I:a:ing, a % ot, M','ic)-
678*
S. De im. Eb tric.d 1;:t;.1::(Nct MWe): 655.
- 6. M .w i m u m 11. p.c u d. le Cap uty (Gro s MWe): ..
690*
- 7. Maxitamn D. ; .nl.'d.' Capacit y (V t MW'e). 670.
S. If Ch..ngs Occer in Capacity Rations (Irems Numhr 3 Throer.h 7) Since !.ast !!crort. Give Reasons:
NONF.
- 9. Pmwr Level To Wh% Retrie:a!,if Any (Net MWe).NONE
- 10. I'raums For I:n:::ct.ons. If Any- N/A-This Month Yr.-to Date C o m u!.n h .'
- 11. Ilour< la Repo: ting i,inad 744.0 5087.0 58223.0
- 12. Nma!,cr Of !!ours Riactor Was Critic.il _4.R7 4?2_ E 6 4133L 1 0.0 0.0 0.0 13.1:cactor Rewne shuidowa llours
- 11. Itours Generat a On.I.ine 465.2 4220.5 399411
- 15. Unit Reserve Sherdown lir,urs 0.0 00 1 Om0.__
- 16. Gross Thernn! Ecot y Ginei.,ted (MWH) 821184.0 813_9.254. 0 .665 B l.06 /u0
- 17. Gross Ilectrical Ener; y Generated (MWil) ') 7 0 l '> n _ n _ . . _ . 2 794 5 50_.f .2192502/n o ._
- 18. Net Electrical Ener :y Generated f MWII) 268216.0 2688603.0 21050167.0
- 19. Unit Senice l' actor 62.5 83.0 68.6
- 20. Unit Av::iiability f actor 62.5 83.0 68.6
- 21. Unit Capacity factor (thing MDC Net) 53.B_ 78.9 54.J)
- 22. Unit Capacity Encter (th.in,q I)ER Net) 55.0 _
80.7 55.2
- 23. Ui.i; FoiccJ Outace Rate 0.0 ILS 10.8
- 24. Shurdm.ns '.chedi.leil Over Nest 6 Months (Type. Date, and Ducatha of Each t:
NONE
- 25. If Shnt D.re.n At End Of Reimrt Period. Estime.ted D.de of St.utop: UNIT OPERATING 2t>. Units in Tc:.t St.uus (Poor to Connuercial Operation s: , Forceast Achiesed INIT IA!. 01:1T:CA1.1TY INil l A l. f.l.!X.1 RICI TY _
CO'.lMI:ltCI A L Ol' fit A T:ON r;. -
f-) . -
G ?. .m.ni p/71 4
7 90p0023 '
AVEl:AGL I).sil.Y UNI 1 ohEl LEVEL DOCl:ET NO. 50-293 g, s'! T PILCRIM I DATE COMPLET ED 11Y *"" " '"
TELEPif 0NE 6!7-746-7900
,y o,;3 i j JULY, 1979 DAY AVER.\G E D ^.!!." POWE!! 1.EVEL DAY AVEI: ACE D \lLY PO%Eli LEVEL (Mh -Net) gsp., c.g g I 664 1, 12-2 665. 459.
I b.
3 664.
39 _
605.
4 665. 598.
20 S I' f> 2 . 213.
I 6 662. ,,.. 433.
7 658. 603.
'3 -
~
8 57.
,4 589.
9 240. 624.
10 558. 662. -'
3 11 206. 28.
g 12 0. C' 28 j
13 0. 0.
29 14 0. 108.
30 15 O. 541.
3 _
16 0.
INSIT!UCTIONS On tha fermat. int the ne s da:h um: p.mer lese! in \lwe. Net for es:h day in the reportin: month. Compu'e to the nearest wncle m: ; rsait.
l4 877 )
1 , , ,
t'c ::z '
\ >
, ^y .
UNIT S!!UTDOWNS AND l'OWER REDUCTICNS DCCL'FT NO. 50-293 U? II N.J:; PILGRIM I
- n a,7; 8/9/ B CC"I't.E T Ei: :;Y C.M. c.Ar t:,EY R EEC.'!T ?.:ONTri JULY. 1979 ;I . I l';.< ,e 617-746-7900 Tn3e E F -. ei E *t
_. E IICC"5CC E'u C m e w, ( cirettr.c N. .. Ibte '5,
. ::-E '._c :E
-u4 o o n
, 2x Ivent :y S. ? ^'""'"
l g =a .
Rc;m:t : 20 N0 50 e 35=a d
I,rae:a i;cturrcr,e c
6 7/8/79 F 28.2 B _ 79-2/3L-0 CD VALVEX LEAK IN HYDRAULIC SYSTEM ON MSIV.
LEAK REPAIRED.
7 7/10/79' S 0.0 B 4 MAIN CONDENSER BACKWASH 8 7/11/79 F 15 3.6 B 2 79-21/1T-0 R3 PIPEXX LEAK IN CRL PITURN LINE WELD.
9 7/21/79 F 11.5 H 3 REACTOR SCRA'O'ED LCSS OF VACUUM DURING CCNDENSER E ACD' ASH.
10 7/27/79 F 85.5 B 3 79-27/1T-0 CD VALVEX REACTOR SCRA'O'ED FROM LOSS OF OFF-SITE POWER. MS RELIEF VALVE CYCLED AUTOMATICALLY, VALVES WERE FIPLACED.
r*j I
.5 3 2 -
3 4 F: F.u s ed Re.non :
- ' S. S !ncdufeil M e t h od . C drbit G Instinctiens A.E luipinent F.:iture (Exp!.iin) ! .'.f a n ail t'rISep.<:a.'n a o: D.c a T- !! .',1.::ntenanse of Test N.N u il Scram i - o Sn. :s te t :.emce
!j C Refe. ;ng .i- A i:o n aine St r.nn. . * .c : i!iRii: .- ( Nt ! R EG-
- 1) !{c;i !.: tory Restriction 4 0:h.ri:a;lun) <- :i
! O ier.itor Tr.inung ? 1.icense Ew:'ina: ion s -
I-AJunne.tratr.. 5 G U; c r.st:o:ial !.i ror ( E x;,l.i:n ) i s! .b. 1 - S.nne Saa ce (9/77) iI Ot!ier (thplaa.)
PILGRIM NUCLEAR FCNER STATION Men t'n JULY' 1979
_ MAJOR SAFETY V' ATED i!':TT' .;5CE TSTE'? CC:OCNENT MALFUNCTION CAUSE l MAINTENA::CE CC EECTI'JE ACTICN l -, <SSe" .,.--,
~ > .,.,.,----..--_,.<-. - - -
- 29 Check Valve Leaks errosica of Renew seat 5 disc Disc ruterial changed frco niresis t to S.S.
seat 6 disc .
29 Service water Excessive vibration Worn bearing:- Renew bearings &
pump N/A pump bowl.
3 Piping Weld Leak l Crack Renew section of N/A piping.
f 10 Pipe Support Design Deficiency Engineering Modified support N/A Desigri i
f 23 ' Pipe Support Design Deficiency Engineer /ng Modified, support N/A Desigt.
10 MOV-1001-36B Key on valve shaft Replaced key and reset limits Sheared t ,
a 1 "D" Relief V1v. Pilot Leakage Dirt crud Installed new Procure new top vorks q - B' Line valves rebuild *
(
1 *
"A" Relief V1v. Pilot Leakage dirt crud sp::rer - rebuild
' l
'A' Line Procure new top works
- . 4 l
l I
13 RCIC testable Leaking packing Furnanited gland check valve Repack during future outage.
. 6
REFUEhl!!G II:r0H!!ATIO!!
The following refueling information is included in the Hont hly Report as requested in a letter to !!r. G. C. Andonnini datid January 18, 1978.
For your convenience, the inforraation supplied h.u been enumerated so t hat each number corresponds to equivalent notation utilized in the request.
- 1. The name of thic facility is pilgrim !!uclear Power Station, Docket !!o . 50-293.
- 2. Scheduled date for next Refueling Shutdeun: January 1980.
- 3. Scheduled date for restart follc, wing refuel ing: April 1980.
4.
- 5. Due to their ninflarity, r equ e s t 4, 5 6 6 are responded to collectively.
- 6. The fuel, which is presently expected to he loaded during the next scheduled shutdown, nay he reloaded fuel of a new design and may t herefore require a proposed license submittal and technical <.pecification change. It D not possible, however, to t.uppl: pertinent information on dates. As inf or:n t ion concerning fuel denign, core confip,uration, Op e ra t. i o n a l heview Cox.ittee deteroinations, proposed licensing action, and technical specification submittals become available, it will he forwarded to you.
- 7. (a) There are 580 fuel assemblies in the core.
(h) There are 580 fuel assemblics in the spent fuel pool.
- 8. (a) The station is presently licem ed to store 2320 spent fuel assemblies.
The actual spent fur 1 storage capacity is 1170 fuel assemblies and new high density fuel st orage racks are in the process of being installed.
(h) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the capacit.y to acconmodate an additional 580 fuel assemblics (one core).
'1 i
- . *.r U O
BOST0*/ EDIS0!! C0!!PA!1Y PI1,GUit! NITCI EAR POWI:n STATIO1; ,
Sunmary of Opera _tions for Ju1L 1979 Unit operated at 100% power unt il Juiy 8 when power was reduced for a condenser backwaeb. Uhile the unit van at re6'oced power tining of the 11SIV's was con-ducted and "D" tiSIV failed to meet an acceptahic time as per Technical Spec i f i ca t ionn . A decision wan made to take the unit off the line, de-inert the drywel1 and rejair the !;SlV. The iepair tutned out to be a leaking bvdraulic i'ne. a The unit van returned to nervice at 0915 on July 9 and w :ile pour wiu, being increa:;ed, 1-3 water box fouled and a leak was discovered in the CRD reiurn line. A decinion van nade on July 11 to renove tie unit Iron nervice and repair the CR0 return line. The unit van renoved f r on seuj re at 1132 1.rn, on .luly 11 and repairr were initiated. The repair: were cospleted and the t.n f t- was returned to nervice at 2110 on July 17. The 1-3 water box remained fouled and a reduct ion was set. to clean the water boxen and the intake piping. During the reduction a nerar. wts experienced f r:m low vacuum at 1313 on .luly 21. The unit was returned to service at 0035 on July 22.
1-3 ua ter lax van s t ill f ouled so the condenser was again bacLwashed on July
- 24. An eni W od bac1 wash had to be conducted again on July 25, due to ex-cessive feuling of 1-3 wa re . box. A reactor scran was experitoced at 0101 on July 27 dee in Int.S of ff-tit. power caused by a lightning strike. "A" and "D" Relief Valve m1ftactienee and had o be rep]Leed. The unit was brought back on line or 142* <: My 30 and ob t ained 100% eut put at. 2230 hourt on July 31.
~I P M (
^" P, ,
.