ML19207A011
ML19207A011 | |
Person / Time | |
---|---|
Issue date: | 07/26/2019 |
From: | Bridget Curran NRC/NRR/DIRS/IRGB |
To: | |
Curran B | |
Shared Package | |
ML19207A005 | List: |
References | |
CN 19-024 | |
Download: ML19207A011 (1) | |
Text
NRC INSPECTION MANUAL DIRS Change Notice 19-024 DELETED: TRANSMITTED:
Number Date Number Date
- 2. IP 71111.21N.02 07/26/19 TRAINING: No special training is required for any documents issued with this Change Notice.
REMARKS: IMC 2515 Appendix A, Risk-Informed Baseline Inspection Program, has been revised to update the table in Attachment 3 to allow inspectors to charge time to IP 92701 for URI closure.
IP 71111.21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements, is an initial issuance. This IP is one of the focused engineering inspections recommended by staff in SECY 18-0113. IN the SECY, staff recommended a quadrennial engineering inspection cycle to begin in 2020 and take the place of Design Basis Assurance Inspection (Teams) and Design Basis Assurance Inspection (Programs).
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 07/26/19 1 19-024