ML19206B204
| ML19206B204 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/24/1969 |
| From: | Racquel Powell US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Tedesco R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7905080054 | |
| Download: ML19206B204 (1) | |
Text
A {W's.r.,
s.*.
, J,
- ;. e,,
UNITED STATE 5
.I ATOMIC ENERGY COMMISSICN wasmsa es ec
.m C'
/WQ' (*-
July 24, 1969 n
.;les-I:-2".
R. L. Tedesco, Chief, RP3-2, DRL T'II t/2 FIC122 7-23 ERROR - OCCKZT ':0. 50-320 The instrumentation and protecticn systens shown in fizure 7-23 of A=endment 10, dated June 4, 1969, is in error. This figure does not agree with the write-up in the text that describes the systen in that no startup rate trip is included.
I have infor ed the applicant and the designer (35'4? cf this error in figure 7-23.
I told them if this ratter ceces up at the hearing, we will note that the figure 7-23 is in error and cur evaluation of the system was based upcn the ?SAR descriptions of tne instrumentation and protectien systems.
They have agreed to this action; however, they also indicated that they may consider a change to the design later.
,n i
Raymond R. Powell Reactor Prcject 3 ranch 2 Division of Reactor Licensing Distribution DRL Files RP3-2 Files R. S. 3cyd V. Mccre D. Sullivan L.
gs t
7 905 08 0cT 9
/;
_