ML19206B125
| ML19206B125 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/01/1971 |
| From: | Case E US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7905070384 | |
| Download: ML19206B125 (1) | |
Text
.
UNITED STATES f@pr.f 1 ',
e%
.i ATOMIC ENERGY CONIN115$1CN w Asmsc es e c. :: m
{'y"
', ~~~*
i '3 p
Peter A. horris, Director Division of Reactor Liccasin;;
REQUEST FOR TEC"SilCAL ASSISTXiCZ I:i TEE RZVIE', OF
"'t MILE ISL.CD L"ilT 2, SUPPLZME:iT 40. 7 -
.T lic. 50-320 -
Due to current scheduling require =ents, our review and ccenents on Supple =ent :io. 7, the description of the first stress-steel S/H prestressing tenden anchorage sys te:2 for nuclear centain=ents, will be co=pleted by March 12,1971.
/.
Edson G. Case, Director Division of Reactor Standards cc:
F. Schroeder, DRL R. Maccary, DRS T. R. '411 son, DRL C. Long, DRL A. Drenerick, DRS D. Ross (2)
R. G. Snith, DRS 4
q e
,)
i u,
t
,)
f
I 4
F..:
2.
Peter A. Morris, Director O'
' ion of Reacter Licens n;;
ECL".ST FCR TECC;ICAL ASSISTA.CZ I;. I"IZ *CVIi4 Cr SREE MILE IStrD CIIT I, S'RTLi23.Z:,T :w. 7 -
DCCC.T JD Q Due to current achedulint re a ui re=e n ts, our review and coc:nents en Sun,1c=en t.7o.
- 7. the descriptien of the first stress-steel Shi crestressin;; tenden anchorage system for nuclear containnents, uill be comeletec bv March 12, 19 71.
C-ir -
'~a h+
Edsen G. Case, Director Di rision of Reactor Standerda ec:
?. Schreeder, DRL R. Macca.7, DRS T. R. Wilsen, DRL C. Long DPl.
A. Dronerick, "P.S
- 3. Ross (2)
DistfibMjgith, DRS Ssppl. (Dc4ketFile) M 3
DR RF DRS RF SE3 RF bec: 2. G. Case n.
/
L n s,
D?
DESLSE3 DRS:SFT omer >
..... _.....,....... 2-
- 1/A..
.. DES.:DIR...
- w -
x
./ p p5 r e:re r e k Maccary Casev
- 4e sunsac >
.1-Lbl..
... +..
m 71
.1-f >/-71 1 C -71 1-:g.-71..
cm
- Form atc.m. n,.. > u, a m n.
- m. m..,.,m,,
8