Ack Telcon Re RO 78-03/1P on 780214:continuous Fire Watch Was Not Established After Cable Room Halon Sys Automatic Actuation Was Tagged Off
ML19206A508
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/14/1978
From: Seelinger J
Metropolitan Edison Co
To: Grier B
NRC Office of Inspection & Enforcement (IE Region I)
Shared Package
ML19206A504 List:
References
NUDOCS 7904200088
Download: ML19206A508 (1)


Text

_ _ _ _ _ _... _ _ _

cgar s f u-a m

W) n. NTII B

.q

/

METROPOLITAM EDISON COMPANY m-

i. _.

POST OFFtCE box anc *.* toot _E'OWN PENNSVL V ANft. '7CS-rFLEDWONE 717 944 404 14 rebruary 1978 58.r. Bnyce H. Grier Directorate of 9egulatory Operations Reginn I

  • uclear Regula tor y (.o nission 631 Park. Avenue King of Prussia. Pennsylvania 19406 Operatino License

DPR-73 McLet:

50-320

SUBJECT:

REPORTABtt OCCUMENCE ND. 79-03/10

Dear Mr. Grier:

This telegran is to (.on' ira the telecon bet eea r. J. L. Seelinger, Uiit II Superintendent, Technical Support, and Mr. D. Haverkaru. Region I-NRC at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> on 14 February 1976.

A violatino of Technical Specification 1.7.10.1 wa'. recognized at 0935 nn la February 1978. in that a continuous ' ire watch was not est9blished after the Cable Roon Halon SV5 ten's auto'atic actuation -25 tagged off.

This incident is considered Reportable under T.S. 6.9.1.R.b.

The Halon Auto iatic Actuation switch on Panci 777 was turned of f at 0845 on 13 February 1978, due to welding in the cabic ree-', but dua to a 7:isinterpretation of the operability of the Cable Roc Heinn Syste,, a continunus fire watch was not established unt,il 0935 on 14 r bruary l?79 e

Further details of this inc ident and corrective actions taken will be discussed in the followoo report.