ML19206A508
| ML19206A508 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/14/1978 |
| From: | Seelinger J Metropolitan Edison Co |
| To: | Grier B NRC Office of Inspection & Enforcement (IE Region I) |
| Shared Package | |
| ML19206A504 | List: |
| References | |
| NUDOCS 7904200088 | |
| Download: ML19206A508 (1) | |
Text
_ _ _ _ _ _... _ _ _
cgar s f u-a m
W) n. NTII B
.q
/
METROPOLITAM EDISON COMPANY m-
- i. _.
POST OFFtCE box anc *.* toot _E'OWN PENNSVL V ANft. '7CS-rFLEDWONE 717 944 404 14 rebruary 1978 58.r. Bnyce H. Grier Directorate of 9egulatory Operations Reginn I
- uclear Regula tor y (.o nission 631 Park. Avenue King of Prussia. Pennsylvania 19406 Operatino License
DPR-73 McLet:
50-320
SUBJECT:
REPORTABtt OCCUMENCE ND. 79-03/10
Dear Mr. Grier:
This telegran is to (.on' ira the telecon bet eea r. J. L. Seelinger, Uiit II Superintendent, Technical Support, and Mr. D. Haverkaru. Region I-NRC at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> on 14 February 1976.
A violatino of Technical Specification 1.7.10.1 wa'. recognized at 0935 nn la February 1978. in that a continuous ' ire watch was not est9blished after the Cable Roon Halon SV5 ten's auto'atic actuation -25 tagged off.
This incident is considered Reportable under T.S. 6.9.1.R.b.
The Halon Auto iatic Actuation switch on Panci 777 was turned of f at 0845 on 13 February 1978, due to welding in the cabic ree-', but dua to a 7:isinterpretation of the operability of the Cable Roc Heinn Syste,, a continunus fire watch was not established unt,il 0935 on 14 r bruary l?79 e
Further details of this inc ident and corrective actions taken will be discussed in the followoo report.
ere t rul v vours.
hA.
-** f f U
- i. Seolinger 8 Unit %peririte'ide it/Technir.al Support i