ML19206A097
| ML19206A097 | |
| Person / Time | |
|---|---|
| Issue date: | 07/25/2019 |
| From: | Reisi-Fard M NRC/NRR/DRA |
| To: | Anderson V Nuclear Energy Institute |
| Reisi-Fard M | |
| Shared Package | |
| ML19206A092 | List: |
| References | |
| NEI 17-07 | |
| Download: ML19206A097 (1) | |
Text
From:
Reisi Fard, Mehdi To:
ANDERSON, Victoria Cc:
Weerakkody, Sunil; Rosenberg, Stacey; Gonzalez, Felix; Linthicum, Roy R.:(GenCo-Nuc); Drouin, Mary; Miller, Ed
Subject:
NRC Comments on NEI 17-07 Date:
Thursday, July 25, 2019 9:10:00 AM Attachments:
NRC Comments (7-24-19) on NEI 17-07 R1 Dec 2018.docx
- Victoria, I have attached NRC comments on the last revision of NEI 17-07 that we received on December 17, 2018. If you like to discuss any of these comments, NRC staff will be ready to do so in the upcoming public meeting on August 21.
- Regards, Mehdi Reisi Fard, Ph.D., P.E.
Acting Branch Chief PRA Licensing Branch B US NRC, Mailstop: OWFN 10C15, Washington, DC 20555 Office: (301) 415-3092 Mehdi.ReisiFard@nrc.gov From: ANDERSON, Victoria <vka@nei.org>
Sent: Monday, December 17, 2018 3:31 PM To: Reisi Fard, Mehdi <Mehdi.Reisifard@nrc.gov>; Hartle, Brandon <Brandon.Hartle@nrc.gov>
Cc: Rosenberg, Stacey <Stacey.Rosenberg@nrc.gov>; Casto, Greg <Greg.Casto@nrc.gov>; Vasavada, Shilp <Shilp.Vasavada@nrc.gov>; Evans, Jonathan <Jonathan.Evans@nrc.gov>; Drouin, Mary
<Mary.Drouin@nrc.gov>; Weerakkody, Sunil <Sunil.Weerakkody@nrc.gov>; Linthicum, Roy R.:
(GenCo-Nuc) <roy.linthicum@exeloncorp.com>; KRUEGER, Greg <gak@nei.org>; GEIER, Stephen
<seg@nei.org>
Subject:
[External_Sender] RE: RE: FYI-Execution of the subset of issues from the standard important to TSTF-505 & NEI-17-07
The revised draft of NEI 17-07 is attached. Absent additional comments from NRC, this is the version we plan to use for the newly developed method peer review pilot process.
In addition to the discussion below, we did not include internal flood references in section 6.5 because an internal flood peer review and internal events peer review can be done at the same time, so these requirements are N/A for internal flood.