Notifies of May 1979 Completion of Planning Effort to Increase Capability to Deal W/Emergency Preparedness & Incident Response
ML19199A643
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/25/1979
From: Ted Carter
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Brown R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7905070052
Download: ML19199A643 (4)


Text

-

APR 2 51979 NEMCRANDUM FOR:

R. S. Brown, Jr., Assistant to the Director and CSlef, Program Support Branch, 5"SS FROM:

Thomas F., Carter, Jr., Deputy Director Division of Fuel Cycle and Material Safety

SUBJECT:

ASSESSMENT OF RESOURCE I" PACT RELATED TO TliREE-MILE ISLAND Fuel Cycle has initiated a planning effort to develop the capabilit'f to adequately deal with FC's energency preparedness and incident respcase responsibilities (reference Manual Chapter 0502-I-B-4.f).

This planning effort is scheduled for conpletion la Say 1979. Only prelininary estinates af FC resources associated with revised progran planning as a result of TMI are now available, pending the completion of our curre.it planning effort.

1.

FYl979 Immediate Effort:

a.

Manpower (1) Regular,153 man hours Non-regular,151 man hours b.

Travel, none c.

Adninistrative Support, none d.

Program Support, none 2.

FY1979 Follow-on Effort:

a.

Reprogranning

'le plan to expend approximately 21/2 MY of effort (five reocle for six months) on emergency preparedness and incident resaonse planning and ir.plementation through the balance of FY1979.

This effort will likely be accomplished by recrogranning about four personnel to this activity for a six ncnths ceriod (2 nn-yr).

790507do5A It is lik ly that the most significant iraacts will be upon the four "ajor Objectives of Operations and Technology noted belc.,

MPICS P u-a==*

DATE M KIC PGEM 318 (9 76) NXCd 0243 D v. s. a e v s = = u s =r

.. w s o.. i e e :,,, e -.. -,..

o]

'g [ -

LU i

R. S. Brcwn, Jr. -

(1) Perform Broad Generic Environmental Inpact Statements and

. Surveys - Update WASH-1248 and Table S-3 (2) Perform Specific Fuel Cycle Studies in Support of National Policy and URC Regulatory Responsibilities - INFCE,iiASAP, etc.

(3)

Refine the Technological Base Through Use of Confirmatory Research and Standards Efforts (4)

Improve the Efficiency and Effectiveness of the Licensing Process - Review Regulations and Procedures for the Front End of the Fuel Cycle Since the actual resources to be allocated to this program are uncer tn, it is rot possible to be completely definitive as to the affected programs. At this time it appears likely that sone or all of the above major objectives may be impacted to sone degree.

To the extent practical, it would be our intent to limit tne effects to a deferral of about six months in objectives 3 and 4.

However, some of the people currently assigned to the planning effort may also be required for the ongoing work and their involvement could also cause delays in accomplishment of objectives 1 and 2.

b.

Supplemental (1) Manpower (a) Emergency preparedness and incident response planning and implementation will require an additional 1/2 MY of effort (one person for six months) not available from reprogramming for the balance of FY1979.

(b) PERSC0"SEN, to be supplied by PSB.

(2) Travel, current estimate is $6,000 of travel expense for the balance of FY1979 (3) Administrative Support, to be deternined (4) Program Supoort, to be determined (5) Equiprent, probably none required 6 ^z

-. g LU i

orric s >

su mma ns r >

c ATs >

M 4* PCRM 313 (9 76) N2CN 024Q 8 v.s

    • vu === s at *a mtme o* *ic a v e - se r e,

s R. S. B rown, Jr. 3.

FY19CO Follow-On Effort:

a.

FY1979 deferred efforts (gross estimates)

(1) Manpower (a) Centinued deferral of FY1979 efforts, 2 MY (b) PERSCOMBEN, to be supplied by PSB (2) Travel, $6,000 (3) Administrative Support, to be deten.11ned (4) Program Support, to be determined (5) Equipment, none b.

flew FY1980 efforts (gross estinates)

(1) Manpower (a)

Four !W of effort in addition to the continued deferral of.two fiY from FY1979 will ~be required through FY19G0 to develop and maintain an adequate FC energency preparedness and incident response capability. This deferral, assuning that it can be limited in impact to major objectives 3 and 4, will add an additional six months impact to those major o'ojectives of 0&T for a projected total deferral of one year in these activities.

lotal FY1980 effort, 6 MY.

(b) PERSCOMBEti, to be supplied by PSB.

(2) Travel, $14,000 for extensive licensee plant visits and assessments (3) Administrative Support, to be determined (4) Program Supoort, preliminary estimate is $150,000 m}

- ~ )

~

L. a enmu y sunnais s >

cate >

FCEC FORM 318 (9 76) NRC4 0243 W w.s. eeve=== e ar.. = rime on ic s : i, v e - a,, - r e.

i.>

Y R. S. Brown, Jr.

3-(5) Equipment, computer time during FY1980 is estinated at 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, for reliability assessments, consequence assessments, plant vital systems modeling and release mechanisms modeling.

c.

Less possible reprograming of planned FY1980 effcrts to offset requirements of 3.a. and b.

(1) Manpower (a) All planned effort on OST Major Objectives 3 and 4 could be deferred to reprogram 2 and 3 !!Y respectively. This alternative would stop the functions of these objectives effectively for a period of about 18 months between now and FY1931.

In addition,1/2 MY of effort could be reprogramed from the planned effort on O&T Major Objective 1, "Begin Assessment of COE Recomended Alternative Themal Reactor Fuel Cycle," which would reduce tha resources on this objective by 50% and result in a delay of about six months. These changes would provide a current total estimate of 51/2 MY available by reprograming of planned FY1930 efforts.

(b) PERSCOMBEfi, to be provided by PSB (2) Travel, to be detemined (3) Administrative Support, to be determined (4) Program Support, deferring OST Major Objective 4 would make approxicately $200,000 available.

(5) Equipment, to be deternineu.

Distribution:

(t1 MSS-79-596)

Original signed by

'Th =as F. Carter Central File, NMSS R/F

- Thomas F. Carter, Jr.

FC R/F Deputy Director FDFisher Division of Fuel Cycle HLowenberg and Material Safety RMWilde TFCarter, Jr.

EAHeumann 61 1~)

BAClausser

'"f' EWLeins

  • See previous yellow far concurrence.

y O c m e. w p

_ f C.. *

. I.CTA.. *

..F.C.0.Ud....E[Uh)..

omes*

-m a

  • Wil@;.t.s/w...EDEisher..

.1!Lcwenberg..

T_FQa rte.ri.t J r.

4/25/79 4/.25G9 4/.25H.9..

4/

.?i rm,

v Distribution: (,lMSS-79-596 )

Central File EAHeumann NMSS R/F BClausser April 24, 1979 FC R/F ELeins FFisher HLowenberg RUilde TFCarter, Jr.

MEMCRANDU1 FOR:

R. S. Brown, J r. Assistant to the Director and Chief, P grc, Support 3 ranch, NMSS FROM:

ThorLs F. Cart r, Jr., Deputy Director 3

Division of Fue Cycle and l'aterial Safety

SUBJECT:

ASSESSMENT OF R; OURCE I" PACT RELATED TO TiiREE MILE ISLAND Fuel Cycle has initiated a plannin. effort to develop the capability to adequately deal with FC's emerge'.cy preparedness and inciJent response responsibilities treferenc Manual Chapter,0502-I-B-4.f).

This planning effort is scheduled fo conpietion in May 1979. Only preliminary estimates.of FC resource associated with revised progran planning as a result of TMI are now a ailable, pending the completion of our current planning effort.

1.

FY1979 Imrediate Effort:

a.

Manpower (1) Regular,153 man hours Non-regular, 151 man hours b.

Travel, none c.

Administrative Support, none d.

Program Support, none 2.

FY1979 Follow-on Effort:

a.

Reprogramming

'n'e plan to expend approxirately 2h MY o effort (five p2 cole for six ronths) on emergency preparedness and incident resennse planning and irolenentation through the balance of FY13/9.

This effort will defer in large measure,1 "Y of s

l 17 1 cv i

\\

FC/

M,, ;Fhh FCOT FC

  • =,,

,[ish'r BLowenberg TFCarter, Jr RMWilde:ts e

4d;[/79 4/24779 4/ /79 4/ /79 mc Poeu na o.m acu om h.........................,............

2

\\

\\

effort (two persons \\ for six months) on 0&T i'ajor Objective 3, " Refine, the Technological Sase Through the Use of Confirmatory Research and Standards Efforts."

and 1 !!Y of effort (two persons for six months) on 03T Major Objective 4, " Improve the Efficiency and Effectiveness of the Licensing Process."

b.

Supplemental (1) Manpower-(a) Emergency preparedness and incident response planning and implementation will require an additicnal 13 'tY of effort (one person \\for six nonths) not available from reprogramning for t e balance of FY1979.

(b) PERSCOM3Eli, to be supplied by PSB.

\\

(2) Travel, current estinate i's 56,000 of travel expense for the balance of FY1973 (3) Adninistrative Support, to b determined.

(4) Program Support, to be datermined.

\\

(5) Equipment, probably none required 3.

FY19E0 Follow-on Effort.

a.

FY1979 deferred efforts (gross estima es)

(1) Manpoter (a) Continued deferral of FY1979 ef orts, 2 MY (b) PERSCOMBE.1, to be supplied by PS1.\\

'(2) Travel, 36,000

\\

(3) Administrative Supcort, to be determined (4) Program Support, to be deternined g

(5) Equipment, none n,

i ; f:

L 6

  1. FF,C E >

u=

  • nats >

mc roux m o.m mcu o2 o

  • o........--..,....

m....................

3

\\

b.

i:ew FY1980 efforts' (gross estirates)

'(1) Manpcwer (a) Four MY of effort; in addition to the continued deferral of tug fiY fron FY 1979 will be required through FY1980 to develop and maintain an adequate FC emergency preparedness and incident response capability. Tota FY19SO effort, 6 MY.

(b) PERSC0"3EN, to be s,upplied by PSB

\\

(2) Travel, $14,000 for extensive licensee plant visits and assessments.

(3) Administrative Support, to be determine

\\

(J) Program Sup,crt, preliminary 'gstimate is 5150,000.

(5) Equipnent, ccmputer time durin\\g FY1930 is estimated at 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, for reliability assessments, consequence assessments, plant vital systems modeling and releas.

mechanisms modeling.

c.

Less possible reprogramming of clannei FY1930 efforts to offset requirerents of 3.a. and b.

\\

\\

(1) Manpower

\\

( a-) All planned effort on O'.T MajoE Objectives 3 and 4 could be deferred to reprocram 2 arid 3 MY resecctively.

In addition, h MY of effort could be recrogramed from the olanned effort en OST Major Objective 1, "Begin Assessment of COE Recommended Alternative Therral Reactor Fuel Cycle," for a current total estimate of 55 MY available by reprocramning of planned FY1900 efforts.

s (b) PERSC0"3EN, to be provided by PSB (2) Travel, to be deternined (3) Administrative Supporte to be determined "l

i ~ s L. u i

  • )

eevios >

sunseans s e-navs D-TCtc FORM 318 (9 76) NRQd 0244 W w.s. e a v e e = = e sev ***airme o* *,c e : i s t e - a o s v e s

4 s

\\

(4) Program Support, deferring 0&T Major Objective 4 wouldrakeapproxir.atelf$200,000 available.

(5) Equipment, to be determin\\ed.

Thomas F.\\ Carter, Jr.

Deputy Lifector Division of\\ Fuel Cycle and Materi 1 Safety

\\