UNITED STATES
+
[,f@p c. (, [ h NUCLEAR REGULATORY COMMISSION i -
9-J ADVISORY COMM4TTEE ON RE ACTOR SAFEGUARDS
,'k
[
WASHING TON. D. C. 2t555 September 14, 1976 L. P. Crocker Technical Assistant to the Di ector Division of Project Management ACRS REVIEW OF THREE MILE ISLAND, UNIT-2 (TMI-2)
The Advisory Cormittee on Reactor Safeguards will commence its review of the application of Metropolitan Edison Company for a license to operate Three Mile Island Nuclear Station, l' nit-2, at a Subcommittee meeting on September 23 and 24, 1975, at the Quality Inn, 5680 Allentown Road, Harrisburg, Pennsylvani.r 17112.
A Tentative Detailed Schedule for this meeting is enclosed.
Would you please infom all NRC Staf f organizations expected to participate in the meeting, as well as other participants (including vendors, A/E's, and any consultants) of our need for 30 paper copies of all slides, tesnsparencies, visual aids, and handouts used to support presentations to the Subecmmittee.
Mr. John Arnold will serve as Chairman of the Subcommittee.
Dr. William Kerr will also participate.
Dr. Walter C. Lipinski will serve as ACRS Consulcant at this meeting.
If there are any questions concerning any of the above planning detail <., please contact me on:
634-141.'-
s(% d
$b:b Rog,nwald Muller Senior Staf f Assistant
Enclosure:
As Stated 7 9 0 5 0 :2 01 TI cc: J H. Arnold M. W. Libarkin W.
Ker:
R. S. Boyd W.
C Lipinski
- 3. C. Rusche M. W. Carbon E. G. Case H. Etherington S. Levine L. 7. Cossick D. B. Vassallo R. F. Fraley R. E. He.ineman R. C. DeYoung S. Hanauer
\\
PROPOSED DETAILED SGIIEDULE TRREE MILE ISL/JiD-2 SUSCC.$ TITTLE MEETING MARRISBURC, PENNSYLVANIA QUALITY INN, 5680 ALLENTCWN 3LVD.
SEPTEMEER 23-24, 1976 Times are Accroximate 2 p.m.
Septemoer 23, 1976 I.
OPENING REMARKS 5 min.
J H. Arnold, Chair:uan, TMI-2 Subcomni ttee II.
INTRODUCTORY REMARKS BY APPLICANT TOTAL T. Crimmins, Metropolitan Edison 30 min.
a)
Introduction 5 min.
b) Construction completion schedule 5 min.
c)" Pre-Op Testing Status 5 mir, d) Start-up Plan and Approach to Power 10 min.
e) Operating Organization - Structure and 5 min.
Responsibilities, Coordination with TMI-l Safety Review f)
Personnel Requalification and Replacement 5 min.
III.
PRESENTATION SY NRC STAFF TOTAL Mr. Harley Silver, Licensing Project Manager 50 min.
~
a) Outstanding Review Items, Includ' 3 30 min.
Completion Schedule (Section 1./ of SER) b) Qualifications of Applicant for 10 min.
Operating Plant c) Conclusions of Staf f 10 min.
O i ~
~
a 4
Three Mile Is 4
..in ember 23-24, 1976 IV.
RESPONSE TO STAFF REPORT - by Applicant 10 min.
V.
COMPI!.T BY PUBLIC IF REOUESTED 20 min.
VI.
TECl!NICAL PRESENTATI0!! BY NRC STAFF TOTAL 80 min.
a) Design Changes Since ACRS Letter at 20 min.
CP Stage b) Restrictions to be Imposed on Plant 15 min.
When it Goes Operational c) Status of Review of RPV Blowdown Forces 15 min.
d) Status of Unresolved Generic Items 30 min.
(ACRS Report No. 4 of April 16, 1976)
The Su'ococmittee will resume the meeti,g at 8:30 a.m.
September 24, 1976.
VII. TECHNICAL PRESENTATION BY APPLICANT TOTAL 230 min.
a) Lessons from TMI-1 20 min.
b). Review o f LERs (TMI-l & TMI-2 Construction) 20 min.
(plus Comments by ILE, NRC Staff) c) Rod Bowing Effect on DNBR 15 min.
d) Grid Stability (Ability to handle recent 10 min.
Millstone Point event) e) Fire Prot 2ction - Comparison of Installed 20 min.
System with Most Recent NELPLA Recom-mendations and Post Brown's Ferry NRC Staff Requirements f) Review of Systems Interaction in As-Built 20 min.
Systems (Separation, etc.)
g) Status of Surveillance Specimen Holder Tubes 5 min.
h) Emergency Plan 15 min.
4 I
I
/
(
ww-
Three Mile I d* ' tember 23-24, 1976
- 1) Flood Fotential and Experience 10 min.
j) Surveillar.ce Program for Grouted Tendons 10 min.
k) Rod Ejection Accident Analysis 20 min.
(including handling of 3-Di=ensional Effe:t)
- 1) System for Appendix I Monitor:n3 2^ min.
m) Other Items Requested by Subcommi: tee 30 min.
VIII. CAUCUS 30 min.
IX.
CLOSI?!G RD%RKS
.......... Adjourn----------
Apr Nimately 3 p.m.
September 24, 1976 e
e 4
/
O a, a e
O MEETING NOTICE
- ~ ~.
'"_jlocket file \\
R. Maccary NRC PDR D. Ross Local PDR R. Tedesco TIC J. Knight LWR-2 Reading S. Pawlicki NRR Reading I. Sihweil B. Rusche P. Check E. Case T. Novak J. Miller Z. Rosztoczy R. Boyd V. Benaroya R. C. DeYoung G. Lainas R. Denise T. Ippolito D. Skovholt V. Moore F. J. Williams R. Vollmer J. Stolz M. Ernst K. Kniel W. Gammill W. Butler
'G. Knighton D. Vassallo B. Youngblood R. Clark W. Regan T. Speis D. Bunch P. Collins J. Collins C. Heltemes W. Kreger R. Houston R. Ballard R. Heineman M. Spangler H. Denton J. Stepp ACRS (16)
L. Hulman S. Varga Meeting Notice file H. Berkow Project Mar.ager.