Letter Sequence Approval |
---|
EPID:L-2018-TOP-0032, Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies (Approved, Closed) |
|
MONTHYEARML19190A2932019-08-0606 August 2019 Cover Letter Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies Project stage: Approval ML19190A2542019-08-0606 August 2019 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies Project stage: Request ML19190A2912019-08-0606 August 2019 NON-PROP Attachment 1 - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies Project stage: Approval ML19190A2812019-08-0606 August 2019 Non-Prop Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies Project stage: Approval ML19283A0382019-10-17017 October 2019 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 OPTIMA2 Fuel Assemblies Project stage: Other 2019-10-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23055A3022023-03-0808 March 2023 Letter - Westinghouse License Transfer Interim Threshold Determination ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan 2024-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML20191A2832020-07-21021 July 2020 Cover Letter - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20196L6332020-07-21021 July 2020 Non-Prop Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20196L6362020-07-21021 July 2020 Non Prop Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0, Updated Nexus Cross-Section Methodology ML20132A3212020-05-12012 May 2020 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 ML20078J3752020-04-16016 April 2020 Final Safety Evaluation for Westinghouse Electric Company Request to Modify Safety Evaluation Report on WCAP-12472-P-A, Beacontm Core Monitoring and Operations Support System ML19364A0232020-02-13013 February 2020 Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Revision 0, Reference Fuel Design SVEA-96 Optima3 ML19364A0242020-02-13013 February 2020 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3 ML19337A6172020-01-14014 January 2020 Attachment - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19337A5442020-01-14014 January 2020 Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19283A5402019-10-31031 October 2019 OEDO-19-00479 - Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation for WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR (Critical Power Ratio) Corr ML19190A2812019-08-0606 August 2019 Non-Prop Enclosure 1 Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies ML19190A2932019-08-0606 August 2019 Cover Letter Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies ML19134A1932019-07-31031 July 2019 Radics Final Nonproprietary SE and Transmittal Letter ML19098B0542019-05-0606 May 2019 Non-Prop Enclosure 1: Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19078A0432019-04-12012 April 2019 Attachment 1 - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Meas ML19078A0342019-04-12012 April 2019 Enclosure 1 - Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement. ML19029A1052019-02-0707 February 2019 Safety Evaluation for Bechtel Quality Assurance Program for Nuclear Power Plants Topical Report, BQ-TOP-1, 2007 Edition, Revision 003 ML18156A0662018-06-15015 June 2018 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor and Ferret (Non-Proprietary) 2020-07-21
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION August 6, 2019 Ms. Camille Zozula, Manager Infrastructure & Facilities Licensing Westinghouse Electric Company 1000 Westinghouse Drive Building 1, Suite 165 Cranberry Township PA 16066
SUBJECT:
FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-15942-P-A/WCAP-15492-NP-A, SUPPLEMENT 1, REVISION 1, MATERIAL CHANGES FOR SVEA-96 OPTIMA2 FUEL ASSEMBLIES (EPID: L-2018-TOP-0032)
Dear Ms. Zozula:
By letter dated January 25, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15357A103), the U.S. Nuclear Regulatory Commission (NRC) issued draft safety evaluation (SE) for the Westinghouse Electric Company (Westinghouse)
Topical Report (TR) WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies. By letter dated June 8, 2016 (ADAMS Accession No. ML16162A752), Westinghouse requested a 24-month suspension of the review of TR WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1. By letter dated July 1, 2016 (ADAMS Accession No. ML16172A185), the NRC issued a suspension of the review letter for TR WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1. On June 14, 2018, a closed meeting was held between the NRC staff and Westinghouse representatives to discuss the restart of the NRC review of WCAP-15942-P-A/
WCAP-15942-NP-A, Supplement 1, Revision 1 (meeting summary ADAMS Accession No. ML18177A168). By letter dated August 28, 2018 (ADAMS Accession No. ML18242A442),
Westinghouse submitted Appendix 1 to WCAP-15942-P-A, Supplement 1, Revision 1, "Effects of Corrosion on Mechanical Design Analyses of Low Tin ZIRLO' Channels," and Appendix 2 to WCAP-15942-P-A, Supplement 1, Revision 1, Operation Limits on Low Tin ZIRLO' Channels, to support the restart of TR WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, review.
The enclosed final SE addresses the applicability of the TR WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies.
The NRC staff has found that TR WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, is acceptable for referencing in licensing applications provided that the conclusions, conditions, and limitations, stipulated in Section 5.0, and applicability defined in the enclosed NRC final SE are met along with the proper documentation.
NOTICE: Enclosure 2 and Attachment 2 transmitted herewith contains SUNSI. When separated from Enclosure 2 and Attachment 2, this transmittal document is decontrolled.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION C. Zozula Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter.
The accepted versions shall incorporate this letter and the enclosed final SE after the title page.
Also, they must contain historical review information, including NRC requests for additional information (RAIs) and your responses. The accepted versions shall include an "-A" (designating accepted) following the TRs identification symbol.
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
- 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
- 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TRs.
If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.
Sincerely,
/RA/
Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902038
Enclosures:
As stated OFFICIAL USE ONLY - PROPRIETARY INFORMATION
ML19190A254 (Package)
ML19190A293 (Letter)
ML19190A283 (Prop SE Enclosure 2)
ML19190A288 (Prop Comment Resolution Attachment 2)
ML19190A291 (Non-prop Comment Resolution Attachment 1)
ML19190A281 (Non-prop SE Enclosure 1) *concurrence via e-mail NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB/LA* NRR/DSS/SNPB* NRR/DLP/PLPB/BC NAME ELenning DHarrison RLukes (SKrepel for) DMorey DATE 03/19/19 8/1/19 8/2/2019 8/6/2019